{"id":404045,"date":"2019-12-18T06:50:27","date_gmt":"2019-12-18T06:50:27","guid":{"rendered":"https:\/\/www.constructionnews.co.uk\/?p=404045"},"modified":"2023-07-28T12:25:42","modified_gmt":"2023-07-28T11:25:42","slug":"top-10-project-reports-year","status":"publish","type":"post","link":"https:\/\/www.constructionnews.co.uk\/project-reports\/top-10-project-reports-year-18-12-2019\/","title":{"rendered":"Top 10 project reports of the year"},"content":{"rendered":"<h2><a href=\"https:\/\/www.constructionnews.co.uk\/buildings\/project-reports\/intu-dazzles-trafford-centre-shoppers-vincis-glass-roof-floor-08-05-2019\/\">10)\u00a0Intu dazzles shoppers with glass roof and floor<\/a><\/h2>\n<p><img loading=\"lazy\" class=\"alignnone size-full wp-image-386635\" src=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/05\/Vinci_Intu_Barton-Square_Trafford-Centre_4.jpg\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/05\/Vinci_Intu_Barton-Square_Trafford-Centre_4.jpg 1024w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/05\/Vinci_Intu_Barton-Square_Trafford-Centre_4-300x200.jpg 300w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/05\/Vinci_Intu_Barton-Square_Trafford-Centre_4-768x512.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p>At Manchester\u2019s Trafford Centre, \u00a375m is being spent on regenerating a wing known as Barton Square. With Vinci on board, Intu is aiming to add some extra theatre to the UK\u2019s third-largest shopping centre. In May, <em>CN<\/em> took a tour.<\/p>\n<div class=\"factfile\">\n<p><strong>Project:<\/strong>\u00a0Barton Square, Trafford Centre<br \/>\n<strong>Client:<\/strong>\u00a0Intu<br \/>\n<strong>Contract value:<\/strong>\u00a0\u00a352m<br \/>\n<strong>Main contractor:<\/strong>\u00a0Vinci<br \/>\n<strong>Completion date:<\/strong>\u00a0March 2020<\/p>\n<\/div>\n<h2>\u00a0<a href=\"https:\/\/www.constructionnews.co.uk\/buildings\/project-reports\/inside-canary-wharfs-flagship-resi-scheme-one-park-drive-01-05-2019\/\">9)\u00a0Inside Canary Wharf\u2019s newest resi skyscraper: One Park Drive<\/a><\/h2>\n<p><img loading=\"lazy\" class=\"size-full wp-image-385828\" src=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/04\/Canary-Wharf-Contractors_Wood-Wharf_2.jpg\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/04\/Canary-Wharf-Contractors_Wood-Wharf_2.jpg 1024w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/04\/Canary-Wharf-Contractors_Wood-Wharf_2-300x200.jpg 300w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/04\/Canary-Wharf-Contractors_Wood-Wharf_2-768x512.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p>One Park Drive is set to tower over a swathe of retail, commercial and residential buildings shooting up in the overhauled Wood Wharf area. <em>CN<\/em> visited in May.<\/p>\n<div class=\"factfile\">\n<p><strong>Project:<\/strong> One Park Drive<br \/>\n<strong>Client:<\/strong> Canary Wharf Group<br \/>\n<strong>Main contractor:<\/strong> Canary Wharf Contractors<br \/>\n<strong>Contract value:<\/strong> Circa \u00a3100m*<br \/>\n<strong>Completion date:<\/strong> Q4 2020 up to level 28; remainder in Q1 2021<br \/>\n*Source: Barbour ABI<\/p>\n<\/div>\n<h2><a href=\"https:\/\/www.constructionnews.co.uk\/contractors\/laing-orourke\/factory-records-laing-orourke-installs-160-tonne-doors-manchester-04-12-2019\/\">8)\u00a0Factory records: Laing O\u2019Rourke installs 160-tonne doors<\/a><\/h2>\n<p><img loading=\"lazy\" class=\"alignnone size-full wp-image-403399\" src=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/12\/Laing-ORourke_The-Factory_1.jpg\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/12\/Laing-ORourke_The-Factory_1.jpg 1024w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/12\/Laing-ORourke_The-Factory_1-300x200.jpg 300w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/12\/Laing-ORourke_The-Factory_1-768x512.jpg 768w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/12\/Laing-ORourke_The-Factory_1-230x153.jpg 230w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p>From building above historic railways to installing massive soundproof doors, Laing O\u2019Rourke has had to innovate to meet Manchester City Council\u2019s exacting demands, as we found earlier this month.<\/p>\n<div class=\"factfile\">\n<p><strong>Project:<\/strong> The Factory<br \/>\n<strong>Client:\u00a0<\/strong>Manchester City Council<br \/>\n<strong>Central contract value:<\/strong>\u00a3108m<br \/>\n<strong>Main contractor:<\/strong> Laing O\u2019Rourke<br \/>\n<strong>Completion date:<\/strong> 2021<\/p>\n<\/div>\n<h2 class=\"p1\"><a href=\"https:\/\/www.constructionnews.co.uk\/civils\/project-reports-civils\/vinci-links-past-present-tideways-super-sewer-15-05-2019\/\"><b>7) Vinci links past and present<\/b><\/a><\/h2>\n<p><img loading=\"lazy\" class=\"alignnone size-full wp-image-387088\" src=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/05\/Vinci-Construction-Grands-Projets_Tideway_4.jpg\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/05\/Vinci-Construction-Grands-Projets_Tideway_4.jpg 1024w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/05\/Vinci-Construction-Grands-Projets_Tideway_4-300x200.jpg 300w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/05\/Vinci-Construction-Grands-Projets_Tideway_4-768x512.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p class=\"p1\">May saw <em>CN<\/em> visit the Tideway scheme in the east, as contractors sought solutions to join London\u2019s super-sewer with its Victorian predecessor.<\/p>\n<div class=\"factfile\">\n<p class=\"p1\"><span class=\"s1\"><b>Project:<\/b><\/span> Thames Tideway Tunnel, East<br \/>\n<span class=\"s1\"><b>Client:<\/b><\/span> Tideway<br \/>\n<span class=\"s3\"><b>Contract value:<\/b><\/span> <span class=\"s4\">\u00a3605m<br \/>\n<\/span><span class=\"s1\"><b>Main contractor:<\/b><\/span> Bachy Soletanche, Costain &amp; Vinci Construction Grands Projets JV<br \/>\n<span class=\"s3\"><b>Completion date:<\/b><\/span><span class=\"s4\"> 2023<\/span><\/p>\n<\/div>\n<h2 class=\"p1\"><a href=\"https:\/\/www.constructionnews.co.uk\/buildings\/project-reports\/prefab-school-build-adds-berkeley-07-08-2019\/\">6)\u00a0<b>Prefab school build adds up for Berkeley<\/b><\/a><\/h2>\n<p><img loading=\"lazy\" class=\"alignnone size-full wp-image-394443\" src=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/08\/Reds10_Green-Park-Village-2.jpg\" alt=\"\" width=\"1024\" height=\"682\" srcset=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/08\/Reds10_Green-Park-Village-2.jpg 1024w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/08\/Reds10_Green-Park-Village-2-300x200.jpg 300w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/08\/Reds10_Green-Park-Village-2-768x512.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p class=\"p1\">Reds10 claimed its modular school scheme in the heart of a new residential quarter in Reading was making a big cost saving compared with traditional methods. In August, <em>CN<\/em> went to see the build in action.<\/p>\n<div class=\"factfile\">\n<p class=\"p1\"><span class=\"s1\"><b>Project:<\/b><\/span> Green Park Village Primary School, Reading<br \/>\n<span class=\"s1\"><b>Client:<\/b><\/span><span class=\"s2\">\u00a0<\/span>St Edwards\/Berkeley Group<br \/>\n<span class=\"s3\"><b>Contract value:<\/b><\/span> <span class=\"s4\">\u00a36.1m<br \/>\n<\/span><span class=\"s3\"><b>Main contractor:<\/b><\/span><span class=\"s4\"> Reds10<br \/>\n<\/span><span class=\"s3\"><b>Completion date:<\/b><\/span><span class=\"s4\"> Oct 2019<\/span><\/p>\n<\/div>\n<h2 class=\"p1\"><a href=\"https:\/\/www.constructionnews.co.uk\/civils\/ferrovial-laing-orourke-build-water-thames-tideway-09-10-2019\/\">5)\u00a0<b>Building into the water for Thames Tideway<\/b><\/a><\/h2>\n<p><img loading=\"lazy\" class=\"alignnone size-full wp-image-398593\" src=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/10\/Ferrovial_Laing-O-Rourke_Blackfriars-Bridge-Foreshore_1.jpg\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/10\/Ferrovial_Laing-O-Rourke_Blackfriars-Bridge-Foreshore_1.jpg 1024w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/10\/Ferrovial_Laing-O-Rourke_Blackfriars-Bridge-Foreshore_1-300x200.jpg 300w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/10\/Ferrovial_Laing-O-Rourke_Blackfriars-Bridge-Foreshore_1-768x512.jpg 768w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/10\/Ferrovial_Laing-O-Rourke_Blackfriars-Bridge-Foreshore_1-230x153.jpg 230w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p class=\"p1\">Work by Ferrovial and Laing O\u2019Rourke to prevent overflow sewage from entering the river involves the tricky job of floating a culvert into place, as <em>CN<\/em> found in October.<\/p>\n<div class=\"factfile\">\n<p class=\"p1\"><span class=\"s1\"><b>Project:<\/b><\/span> Blackfriars Bridge Foreshore<br \/>\n<span class=\"s1\"><b>Client:\u00a0<\/b><\/span>Tideway<br \/>\n<span class=\"s2\"><b>Central contract value:<\/b><\/span> <span class=\"s3\">\u00a31bn*<br \/>\n<\/span><span class=\"s1\"><b>Main contractor:<\/b><\/span> Ferrovial and Laing O\u2019Rourke joint venture<br \/>\n*Between Falconbrook Pumping Station in the west to Blackfriars Bridge in the east<\/p>\n<\/div>\n<h2 class=\"p1\"><a href=\"https:\/\/www.constructionnews.co.uk\/civils\/cn-visits-hinkley-point-cs-three-megaprojects-one-23-10-2019\/\"><b>4) Hinkley&#8217;s \u2018three megaprojects in one\u2019<\/b><\/a><\/h2>\n<p><img loading=\"lazy\" class=\"alignnone size-full wp-image-399859\" src=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/10\/Hinkley-Point-C-Oct-2019-3.jpg\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/10\/Hinkley-Point-C-Oct-2019-3.jpg 1024w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/10\/Hinkley-Point-C-Oct-2019-3-300x200.jpg 300w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/10\/Hinkley-Point-C-Oct-2019-3-768x512.jpg 768w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/10\/Hinkley-Point-C-Oct-2019-3-230x153.jpg 230w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p class=\"p1\">Amid cost hikes and potential delays on the project, we paid an exclusive visit in October to the huge Hinkley Point C site.<\/p>\n<div class=\"factfile\">\n<p class=\"p1\"><span class=\"s1\"><b>Project:<\/b><\/span> Hinkley Point C<br \/>\n<span class=\"s2\"><b>Client:<\/b><\/span>\u00a0<span class=\"s3\">EDF<br \/>\n<\/span><span class=\"s2\"><b>Project value:<\/b><\/span><span class=\"s3\"> \u00a322.9bn<br \/>\n<\/span><span class=\"s1\"><b>Main civils contractor:<\/b><\/span> Bylor (Bouygues \/ Laing O\u2019Rourke JV)<br \/>\n<span class=\"s2\"><b>Completion date:<\/b><\/span><span class=\"s3\"> 2025<\/span><\/p>\n<\/div>\n<h2><a href=\"https:\/\/www.constructionnews.co.uk\/buildings\/project-reports\/antarctica-bam-building-end-earth-20-11-2019\/\">3)\u00a0<b>Bam builds at the end of the Earth<\/b><\/a><\/h2>\n<p><img loading=\"lazy\" class=\"alignnone size-full wp-image-402209\" src=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/11\/Bam-Nuttall_British-Antarctic-Survey_Rothera-research_7_Credit-Alan-Roper.jpg\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/11\/Bam-Nuttall_British-Antarctic-Survey_Rothera-research_7_Credit-Alan-Roper.jpg 1024w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/11\/Bam-Nuttall_British-Antarctic-Survey_Rothera-research_7_Credit-Alan-Roper-300x200.jpg 300w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/11\/Bam-Nuttall_British-Antarctic-Survey_Rothera-research_7_Credit-Alan-Roper-768x512.jpg 768w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/11\/Bam-Nuttall_British-Antarctic-Survey_Rothera-research_7_Credit-Alan-Roper-230x153.jpg 230w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p class=\"p1\"><span class=\"s1\">Bam Nuttall is braving killer whales, icebergs and stark isolation in Antarctica to deliver a new wharf in time for the arrival of the RRS Sir David Attenborough. <em>CN<\/em> assessed progress at the start of the six-month building period.<\/span><\/p>\n<div class=\"factfile\">\n<p class=\"p1\"><span class=\"s1\"><b>Project:<\/b><\/span> Rothera Research Station wharf, Antarctica<br \/>\n<span class=\"s1\"><b>Client:<\/b><\/span> British Antarctic Survey<br \/>\n<span class=\"s3\"><b>Contract value:<\/b><\/span> <span class=\"s4\">\u00a3100m<br \/>\n<\/span><span class=\"s3\"><b>Main contractor:<\/b><\/span><span class=\"s4\"> Bam Nuttall<br \/>\n<\/span><span class=\"s3\"><b>Completion date:<\/b><\/span><span class=\"s4\"><a href=\"https:\/\/www.constructionnews.co.uk\/civils\/cn-visits-hinkley-point-cs-three-megaprojects-one-23-10-2019\/\">\u00a0April 2020<\/a><\/span><\/p>\n<\/div>\n<h2 class=\"p1\"><a href=\"https:\/\/www.constructionnews.co.uk\/buildings\/project-reports\/lendleases-lego-like-timber-build-heart-olympic-park-18-09-2019\/\"><b>2) Lendlease\u2019s \u2018Lego-like\u2019 timber build<\/b><\/a><\/h2>\n<div id=\"attachment_396961\" class=\"wp-caption alignnone\" style=\"max-width: 1034px;\"><img loading=\"lazy\" class=\"size-full wp-image-396961\" src=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/09\/Lendlease_IQL_7_credit-Mike-O-Dwyer.jpg\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/09\/Lendlease_IQL_7_credit-Mike-O-Dwyer.jpg 1024w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/09\/Lendlease_IQL_7_credit-Mike-O-Dwyer-300x200.jpg 300w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/09\/Lendlease_IQL_7_credit-Mike-O-Dwyer-768x512.jpg 768w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><p class=\"wp-caption-text\">Source: Mike O&#8217;Dwyer<\/p><\/div>\n<p class=\"p1\">September saw <em>CN<\/em> visit an offsite development at Stratford\u2019s Queen Elizabeth Olympic Park \u2013 a timber pavilion that is being built above the busy Docklands Light Railway.<\/p>\n<div class=\"factfile\">\n<p class=\"p1\"><span class=\"s1\"><b>Project:<\/b><\/span> IQL Pavilion<br \/>\n<span class=\"s1\"><b>Client:<\/b><\/span> <span class=\"s3\">International Quarter London<br \/>\n<\/span><span class=\"s1\"><b>Contract value:<\/b><\/span> \u00a3200,000* (Overall IQL development value \u00a32.4bn)<br \/>\n<span class=\"s3\"><b>Main contractor:<\/b><\/span><span class=\"s4\"> Lendlease<br \/>\n<\/span><span class=\"s3\"><b>Completion date:<\/b><\/span><span class=\"s4\">\u00a0Spring 2020<br \/>\n<\/span>*Contract value estimated using Glenigan.com<\/p>\n<\/div>\n<h2 class=\"p1\"><a href=\"https:\/\/www.constructionnews.co.uk\/civils\/project-reports-civils\/inside-leicester-city-fcs-new-training-ground-27-11-2019\/\"><b>1)\u00a0<\/b>Inside Leicester City FC\u2019s new training ground<\/a><\/h2>\n<p><img loading=\"lazy\" class=\"size-full wp-image-402787\" src=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/11\/Leicester-City-training-ground-2019-4.jpg\" alt=\"\" width=\"1024\" height=\"683\" srcset=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/11\/Leicester-City-training-ground-2019-4.jpg 1024w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/11\/Leicester-City-training-ground-2019-4-300x200.jpg 300w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/11\/Leicester-City-training-ground-2019-4-768x512.jpg 768w, https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/11\/Leicester-City-training-ground-2019-4-230x153.jpg 230w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p class=\"p1\">In November, <em>CN<\/em> headed to Leicestershire, as the main contractor faced a race against time to build a state-of-the-art training ground for the city\u2019s Premier League football club in time for next season.<\/p>\n<div class=\"factfile\">\n<p class=\"p1\"><span class=\"s1\"><b>Project:<\/b><\/span> Leicester City FC Training Ground<br \/>\n<span class=\"s1\"><b>Client:<\/b><\/span> Leicester City FC<br \/>\n<span class=\"s3\"><b>Contract value:<\/b><\/span> <span class=\"s4\">\u00a395m<br \/>\n<\/span><span class=\"s3\"><b>Main contractor:<\/b><\/span><span class=\"s4\">\u00a0McLaren<br \/>\n<\/span><span class=\"s3\"><b>Completion date:<\/b><\/span><span class=\"s4\"> 29 June 2020<\/span><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>10)\u00a0Intu dazzles shoppers with glass roof and floor At Manchester\u2019s Trafford Centre, \u00a375m is being spent on regenerating a wing known as Barton Square. With Vinci on board, Intu is aiming to add some extra theatre to the UK\u2019s third-largest shopping centre. In May, CN took a tour. Project:\u00a0Barton Square, Trafford Centre Client:\u00a0Intu Contract value:\u00a0\u00a352m &#8230;<\/p>\n","protected":false},"author":3177,"featured_media":399859,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ep_exclude_from_search":false},"categories":[549,557],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<meta name=\"description\" content=\"10)\u00a0Intu dazzles shoppers with glass roof and floor At Manchester\u2019s Trafford Centre, \u00a375m is being spent on regenerating a wing known as Barton Square.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionnews.co.uk\/civils\/top-10-project-reports-year-18-12-2019\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Top 10 project reports of the year | Construction News\" \/>\n<meta property=\"og:description\" content=\"10)\u00a0Intu dazzles shoppers with glass roof and floor At Manchester\u2019s Trafford Centre, \u00a375m is being spent on regenerating a wing known as Barton Square.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionnews.co.uk\/civils\/top-10-project-reports-year-18-12-2019\/\" \/>\n<meta property=\"og:site_name\" content=\"Construction News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/CN.community\" \/>\n<meta property=\"article:published_time\" content=\"2019-12-18T06:50:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-07-28T11:25:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/10\/Hinkley-Point-C-Oct-2019-3-1024x683.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary\" \/>\n<meta name=\"twitter:creator\" content=\"@CNplus\" \/>\n<meta name=\"twitter:site\" content=\"@CNplus\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ed Brereton\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\",\"url\":\"https:\/\/www.constructionnews.co.uk\/\",\"name\":\"Construction News\",\"description\":\"Read UK Construction Industry News, Analysis, Opinion and data\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-GB\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/civils\/top-10-project-reports-year-18-12-2019\/#primaryimage\",\"inLanguage\":\"en-GB\",\"url\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/10\/Hinkley-Point-C-Oct-2019-3.jpg\",\"contentUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/10\/Hinkley-Point-C-Oct-2019-3.jpg\",\"width\":1024,\"height\":683,\"caption\":\"Hinkley Point C\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/civils\/top-10-project-reports-year-18-12-2019\/#webpage\",\"url\":\"https:\/\/www.constructionnews.co.uk\/civils\/top-10-project-reports-year-18-12-2019\/\",\"name\":\"Top 10 project reports of the year | Construction News\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/civils\/top-10-project-reports-year-18-12-2019\/#primaryimage\"},\"datePublished\":\"2019-12-18T06:50:27+00:00\",\"dateModified\":\"2023-07-28T11:25:42+00:00\",\"author\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/25fcda8c1750f948f022281cfd903492\"},\"description\":\"10)\u00a0Intu dazzles shoppers with glass roof and floor At Manchester\u2019s Trafford Centre, \u00a375m is being spent on regenerating a wing known as Barton Square.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/civils\/top-10-project-reports-year-18-12-2019\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/civils\/top-10-project-reports-year-18-12-2019\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/civils\/top-10-project-reports-year-18-12-2019\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.constructionnews.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Top 10 project reports of the year\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/25fcda8c1750f948f022281cfd903492\",\"name\":\"Ed Brereton\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#personlogo\",\"inLanguage\":\"en-GB\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/7670a59eca55e6e5ec19faba6350968f?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/7670a59eca55e6e5ec19faba6350968f?s=96&d=mm&r=g\",\"caption\":\"Ed Brereton\"},\"url\":\"https:\/\/www.constructionnews.co.uk\/author\/edward-brereton\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"description":"10)\u00a0Intu dazzles shoppers with glass roof and floor At Manchester\u2019s Trafford Centre, \u00a375m is being spent on regenerating a wing known as Barton Square.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionnews.co.uk\/civils\/top-10-project-reports-year-18-12-2019\/","og_locale":"en_GB","og_type":"article","og_title":"Top 10 project reports of the year | Construction News","og_description":"10)\u00a0Intu dazzles shoppers with glass roof and floor At Manchester\u2019s Trafford Centre, \u00a375m is being spent on regenerating a wing known as Barton Square.","og_url":"https:\/\/www.constructionnews.co.uk\/civils\/top-10-project-reports-year-18-12-2019\/","og_site_name":"Construction News","article_publisher":"https:\/\/www.facebook.com\/CN.community","article_published_time":"2019-12-18T06:50:27+00:00","article_modified_time":"2023-07-28T11:25:42+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/10\/Hinkley-Point-C-Oct-2019-3-1024x683.jpg","type":"image\/jpeg"}],"twitter_card":"summary","twitter_creator":"@CNplus","twitter_site":"@CNplus","twitter_misc":{"Written by":"Ed Brereton","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/www.constructionnews.co.uk\/#website","url":"https:\/\/www.constructionnews.co.uk\/","name":"Construction News","description":"Read UK Construction Industry News, Analysis, Opinion and data","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-GB"},{"@type":"ImageObject","@id":"https:\/\/www.constructionnews.co.uk\/civils\/top-10-project-reports-year-18-12-2019\/#primaryimage","inLanguage":"en-GB","url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/10\/Hinkley-Point-C-Oct-2019-3.jpg","contentUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2019\/10\/Hinkley-Point-C-Oct-2019-3.jpg","width":1024,"height":683,"caption":"Hinkley Point C"},{"@type":"WebPage","@id":"https:\/\/www.constructionnews.co.uk\/civils\/top-10-project-reports-year-18-12-2019\/#webpage","url":"https:\/\/www.constructionnews.co.uk\/civils\/top-10-project-reports-year-18-12-2019\/","name":"Top 10 project reports of the year | Construction News","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/civils\/top-10-project-reports-year-18-12-2019\/#primaryimage"},"datePublished":"2019-12-18T06:50:27+00:00","dateModified":"2023-07-28T11:25:42+00:00","author":{"@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/25fcda8c1750f948f022281cfd903492"},"description":"10)\u00a0Intu dazzles shoppers with glass roof and floor At Manchester\u2019s Trafford Centre, \u00a375m is being spent on regenerating a wing known as Barton Square.","breadcrumb":{"@id":"https:\/\/www.constructionnews.co.uk\/civils\/top-10-project-reports-year-18-12-2019\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionnews.co.uk\/civils\/top-10-project-reports-year-18-12-2019\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionnews.co.uk\/civils\/top-10-project-reports-year-18-12-2019\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionnews.co.uk\/"},{"@type":"ListItem","position":2,"name":"Top 10 project reports of the year"}]},{"@type":"Person","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/25fcda8c1750f948f022281cfd903492","name":"Ed Brereton","image":{"@type":"ImageObject","@id":"https:\/\/www.constructionnews.co.uk\/#personlogo","inLanguage":"en-GB","url":"https:\/\/secure.gravatar.com\/avatar\/7670a59eca55e6e5ec19faba6350968f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/7670a59eca55e6e5ec19faba6350968f?s=96&d=mm&r=g","caption":"Ed Brereton"},"url":"https:\/\/www.constructionnews.co.uk\/author\/edward-brereton\/"}]}},"_links":{"self":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/404045"}],"collection":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/users\/3177"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/comments?post=404045"}],"version-history":[{"count":11,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/404045\/revisions"}],"predecessor-version":[{"id":404104,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/404045\/revisions\/404104"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media\/399859"}],"wp:attachment":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media?parent=404045"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/categories?post=404045"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/tags?post=404045"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}