{"id":429658,"date":"2020-12-10T13:26:04","date_gmt":"2020-12-10T13:26:04","guid":{"rendered":"https:\/\/www.constructionnews.co.uk\/?p=429658"},"modified":"2020-12-10T13:34:00","modified_gmt":"2020-12-10T13:34:00","slug":"construction-recovery-slowed-in-october","status":"publish","type":"post","link":"https:\/\/www.constructionnews.co.uk\/brexit\/construction-recovery-slowed-in-october-10-12-2020\/","title":{"rendered":"Construction recovery slowed in October"},"content":{"rendered":"<p>The recovery in construction output continued in October, but was slower than in previous months.<\/p>\n<p>Construction output crept up by 1 per cent in October compared to September, new data from the Office for National Statistics has revealed. It was the sixth straight month of growth since the recovery from the spring lockdown began in May. Despite the improvement, the industry\u2019s monthly output of \u00a313.1bn is almost \u00a31bn lower than it was in February, before the pandemic struck, and more than \u00a31.1bn lower than it stood at the same time last year.<\/p>\n<p>Gareth Belsham, director of property consultancy Naismiths, said the rate of growth had \u201cslowed badly\u201d. Adding that <strong>\u201c<\/strong>October\u2019s wobble shows the recovery is far from complete and remains fragile.\u201d<\/p>\n<p>Output for both private housing and private commercial work declined in the month, albeit after periods of strong growth. Continued growth in infrastructure saw the sector surpass its output level from 12 months ago. It is the only sector to achieve this feat.<\/p>\n<p>PMI data for November, <a href=\"https:\/\/www.constructionnews.co.uk\/financial\/new-business-shows-fastest-growth-in-six-years-04-12-2020\/\">released last week<\/a>, showed an increase in activity in the month and the biggest uptick in orders for six years. However Belsham warned that the industry could be harmed at the start of 2021 if the UK does not sign a deal with the EU. \u201cThere\u2019s now a very real prospect that from 1st January, trade barriers will add cost and delays to the imports of certain crucial building materials,\u201d he said.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The recovery in construction output continued in October, but was slower than in previous months. Construction output crept up by 1 per cent in October compared to September, new data from the Office for National Statistics has revealed. It was the sixth straight month of growth since the recovery from the spring lockdown began in &#8230;<\/p>\n","protected":false},"author":26091,"featured_media":342106,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ep_exclude_from_search":false},"categories":[564],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<meta name=\"description\" content=\"The recovery in construction output continued in October, but was slower than in previous months. Construction output crept up by 1 per cent in October\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionnews.co.uk\/data\/construction-recovery-slowed-in-october-10-12-2020\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction recovery slowed in October | Construction News\" \/>\n<meta property=\"og:description\" content=\"The recovery in construction output continued in October, but was slower than in previous months. Construction output crept up by 1 per cent in October\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionnews.co.uk\/data\/construction-recovery-slowed-in-october-10-12-2020\/\" \/>\n<meta property=\"og:site_name\" content=\"Construction News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/CN.community\" \/>\n<meta property=\"article:published_time\" content=\"2020-12-10T13:26:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-12-10T13:34:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2015\/02\/Generic_Sites-construction-cranes-projects-activity-1024x767.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"767\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary\" \/>\n<meta name=\"twitter:creator\" content=\"@CNplus\" \/>\n<meta name=\"twitter:site\" content=\"@CNplus\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"David Price\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\",\"url\":\"https:\/\/www.constructionnews.co.uk\/\",\"name\":\"Construction News\",\"description\":\"Read UK Construction Industry News, Analysis, Opinion and data\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-GB\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/data\/construction-recovery-slowed-in-october-10-12-2020\/#primaryimage\",\"inLanguage\":\"en-GB\",\"url\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2015\/02\/Generic_Sites-construction-cranes-projects-activity.jpg\",\"contentUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2015\/02\/Generic_Sites-construction-cranes-projects-activity.jpg\",\"width\":1024,\"height\":767,\"caption\":\"Generic_Sites construction cranes projects activity\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/data\/construction-recovery-slowed-in-october-10-12-2020\/#webpage\",\"url\":\"https:\/\/www.constructionnews.co.uk\/data\/construction-recovery-slowed-in-october-10-12-2020\/\",\"name\":\"Construction recovery slowed in October | Construction News\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/data\/construction-recovery-slowed-in-october-10-12-2020\/#primaryimage\"},\"datePublished\":\"2020-12-10T13:26:04+00:00\",\"dateModified\":\"2020-12-10T13:34:00+00:00\",\"author\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/e137ff082123dd14067294da7c3775cf\"},\"description\":\"The recovery in construction output continued in October, but was slower than in previous months. Construction output crept up by 1 per cent in October\",\"breadcrumb\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/data\/construction-recovery-slowed-in-october-10-12-2020\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/data\/construction-recovery-slowed-in-october-10-12-2020\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/data\/construction-recovery-slowed-in-october-10-12-2020\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.constructionnews.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Construction recovery slowed in October\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/e137ff082123dd14067294da7c3775cf\",\"name\":\"David Price\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#personlogo\",\"inLanguage\":\"en-GB\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/ecd83c83caac7de78ee77f4ff86218cb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/ecd83c83caac7de78ee77f4ff86218cb?s=96&d=mm&r=g\",\"caption\":\"David Price\"},\"url\":\"https:\/\/www.constructionnews.co.uk\/author\/david-price-5\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"description":"The recovery in construction output continued in October, but was slower than in previous months. Construction output crept up by 1 per cent in October","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionnews.co.uk\/data\/construction-recovery-slowed-in-october-10-12-2020\/","og_locale":"en_GB","og_type":"article","og_title":"Construction recovery slowed in October | Construction News","og_description":"The recovery in construction output continued in October, but was slower than in previous months. Construction output crept up by 1 per cent in October","og_url":"https:\/\/www.constructionnews.co.uk\/data\/construction-recovery-slowed-in-october-10-12-2020\/","og_site_name":"Construction News","article_publisher":"https:\/\/www.facebook.com\/CN.community","article_published_time":"2020-12-10T13:26:04+00:00","article_modified_time":"2020-12-10T13:34:00+00:00","og_image":[{"width":1024,"height":767,"url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2015\/02\/Generic_Sites-construction-cranes-projects-activity-1024x767.jpg","type":"image\/jpeg"}],"twitter_card":"summary","twitter_creator":"@CNplus","twitter_site":"@CNplus","twitter_misc":{"Written by":"David Price","Estimated reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/www.constructionnews.co.uk\/#website","url":"https:\/\/www.constructionnews.co.uk\/","name":"Construction News","description":"Read UK Construction Industry News, Analysis, Opinion and data","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-GB"},{"@type":"ImageObject","@id":"https:\/\/www.constructionnews.co.uk\/data\/construction-recovery-slowed-in-october-10-12-2020\/#primaryimage","inLanguage":"en-GB","url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2015\/02\/Generic_Sites-construction-cranes-projects-activity.jpg","contentUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2015\/02\/Generic_Sites-construction-cranes-projects-activity.jpg","width":1024,"height":767,"caption":"Generic_Sites construction cranes projects activity"},{"@type":"WebPage","@id":"https:\/\/www.constructionnews.co.uk\/data\/construction-recovery-slowed-in-october-10-12-2020\/#webpage","url":"https:\/\/www.constructionnews.co.uk\/data\/construction-recovery-slowed-in-october-10-12-2020\/","name":"Construction recovery slowed in October | Construction News","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/data\/construction-recovery-slowed-in-october-10-12-2020\/#primaryimage"},"datePublished":"2020-12-10T13:26:04+00:00","dateModified":"2020-12-10T13:34:00+00:00","author":{"@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/e137ff082123dd14067294da7c3775cf"},"description":"The recovery in construction output continued in October, but was slower than in previous months. Construction output crept up by 1 per cent in October","breadcrumb":{"@id":"https:\/\/www.constructionnews.co.uk\/data\/construction-recovery-slowed-in-october-10-12-2020\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionnews.co.uk\/data\/construction-recovery-slowed-in-october-10-12-2020\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionnews.co.uk\/data\/construction-recovery-slowed-in-october-10-12-2020\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionnews.co.uk\/"},{"@type":"ListItem","position":2,"name":"Construction recovery slowed in October"}]},{"@type":"Person","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/e137ff082123dd14067294da7c3775cf","name":"David Price","image":{"@type":"ImageObject","@id":"https:\/\/www.constructionnews.co.uk\/#personlogo","inLanguage":"en-GB","url":"https:\/\/secure.gravatar.com\/avatar\/ecd83c83caac7de78ee77f4ff86218cb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ecd83c83caac7de78ee77f4ff86218cb?s=96&d=mm&r=g","caption":"David Price"},"url":"https:\/\/www.constructionnews.co.uk\/author\/david-price-5\/"}]}},"_links":{"self":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/429658"}],"collection":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/users\/26091"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/comments?post=429658"}],"version-history":[{"count":5,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/429658\/revisions"}],"predecessor-version":[{"id":429667,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/429658\/revisions\/429667"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media\/342106"}],"wp:attachment":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media?parent=429658"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/categories?post=429658"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/tags?post=429658"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}