{"id":502308,"date":"2024-07-15T11:53:00","date_gmt":"2024-07-15T10:53:00","guid":{"rendered":"https:\/\/www.constructionnews.co.uk\/?p=502308"},"modified":"2024-07-15T11:53:00","modified_gmt":"2024-07-15T10:53:00","slug":"skanska-scoops-105m-office-development","status":"publish","type":"post","link":"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-scoops-105m-office-development-15-07-2024\/","title":{"rendered":"Skanska scoops \u00a3105m office development"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Skanska has secured the contract to replace a nine-storey office block overlooking London\u2019s River Thames, involving the reconstruction of the retained century-old facade.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The Swedish contractor will design and build the 12,100 square metre flexible workspace for Baola Properties at 7 Millbank (pictured).<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The facade, which was built in 1913 as part of British American Tobacco\u2019s headquarters, was \u201ccarefully deconstructed and stored\u201d before demolition works, and will be rebuilt into the structure later in the programme.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">McGee demolished most of the building under a contract signed in 2022. Make Architects, engineering consultancy Waterman Structures and consultants from Hilson Moran were also involved in the project.<\/span><\/p>\n<p><a href=\"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/\"><span style=\"font-weight: 400;\">Skanska<\/span><\/a><span style=\"font-weight: 400;\"> will further deliver mechanical and electrical engineering services on the \u00a3105m development.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The project will target a BREEAM outstanding rating and a Nabers five-star accreditation.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Construction work will begin this month and is expected to complete in January 2027.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">It got the go-ahead despite objections from the BBC and ITV, which both have television studios next door at 4 Millbank and warned that the noise from construction work would have an impact on their television productions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The project is Skanska\u2019s latest win in the office sector, after it<\/span><a href=\"https:\/\/www.constructionnews.co.uk\/contractors\/morgan-sindall\/morgan-sindall-and-skanska-sign-for-cambridge-jobs-worth-277m-22-02-2024\/\"> <span style=\"font-weight: 400;\">picked up a \u00a3200m job in February to build a 50,000 square metre<\/span><\/a><span style=\"font-weight: 400;\"> development in Cambridge.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Skanska<\/span><a href=\"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-lauds-early-engagement-as-profit-inches-up-09-07-2024\/\"> <span style=\"font-weight: 400;\">reported an increased pre-tax profit earlier<\/span><\/a><span style=\"font-weight: 400;\"> this month, while turnover was slightly down at \u00a31.33bn. The contractor said \u201cearly engagement\u201d was key to keeping project costs to a minimum and reducing project risks.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Skanska is the <\/span><a href=\"https:\/\/www.constructionnews.co.uk\/financial\/cn100-2023-back-in-the-driving-seat-21-09-2023\/\"><span style=\"font-weight: 400;\">13th biggest contractor in the UK, according to the latest iteration<\/span><\/a><span style=\"font-weight: 400;\"> of the CN100 ranking.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Skanska has secured the contract to replace a nine-storey office block overlooking London\u2019s River Thames, involving the reconstruction of the retained century-old facade. The Swedish contractor will design and build the 12,100 square metre flexible workspace for Baola Properties at 7 Millbank (pictured). The facade, which was built in 1913 as part of British American &#8230;<\/p>\n","protected":false},"author":90643,"featured_media":502339,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ep_exclude_from_search":false},"categories":[547,543,556],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<meta name=\"description\" content=\"Skanska has secured the contract to replace a nine-storey office block overlooking London\u2019s River Thames, involving the reconstruction of the retained\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-scoops-105m-office-development-15-07-2024\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Skanska scoops \u00a3105m office development | Construction News\" \/>\n<meta property=\"og:description\" content=\"Skanska has secured the contract to replace a nine-storey office block overlooking London\u2019s River Thames, involving the reconstruction of the retained\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-scoops-105m-office-development-15-07-2024\/\" \/>\n<meta property=\"og:site_name\" content=\"Construction News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/CN.community\" \/>\n<meta property=\"article:published_time\" content=\"2024-07-15T10:53:00+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/07\/Skanska-7-Millbank.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@CNplus\" \/>\n<meta name=\"twitter:site\" content=\"@CNplus\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Joshua Stein\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\",\"url\":\"https:\/\/www.constructionnews.co.uk\/\",\"name\":\"Construction News\",\"description\":\"Read UK Construction Industry News, Analysis, Opinion and data\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-GB\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-scoops-105m-office-development-15-07-2024\/#primaryimage\",\"inLanguage\":\"en-GB\",\"url\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/07\/Skanska-7-Millbank.jpg\",\"contentUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/07\/Skanska-7-Millbank.jpg\",\"width\":1024,\"height\":683},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-scoops-105m-office-development-15-07-2024\/#webpage\",\"url\":\"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-scoops-105m-office-development-15-07-2024\/\",\"name\":\"Skanska scoops \u00a3105m office development | Construction News\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-scoops-105m-office-development-15-07-2024\/#primaryimage\"},\"datePublished\":\"2024-07-15T10:53:00+00:00\",\"dateModified\":\"2024-07-15T10:53:00+00:00\",\"author\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc\"},\"description\":\"Skanska has secured the contract to replace a nine-storey office block overlooking London\u2019s River Thames, involving the reconstruction of the retained\",\"breadcrumb\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-scoops-105m-office-development-15-07-2024\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-scoops-105m-office-development-15-07-2024\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-scoops-105m-office-development-15-07-2024\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.constructionnews.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Skanska scoops \u00a3105m office development\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc\",\"name\":\"Joshua Stein\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#personlogo\",\"inLanguage\":\"en-GB\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8625f5ceef31a65fc91e25182beb7a92?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8625f5ceef31a65fc91e25182beb7a92?s=96&d=mm&r=g\",\"caption\":\"Joshua Stein\"},\"url\":\"https:\/\/www.constructionnews.co.uk\/author\/joshua-stein\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"description":"Skanska has secured the contract to replace a nine-storey office block overlooking London\u2019s River Thames, involving the reconstruction of the retained","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-scoops-105m-office-development-15-07-2024\/","og_locale":"en_GB","og_type":"article","og_title":"Skanska scoops \u00a3105m office development | Construction News","og_description":"Skanska has secured the contract to replace a nine-storey office block overlooking London\u2019s River Thames, involving the reconstruction of the retained","og_url":"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-scoops-105m-office-development-15-07-2024\/","og_site_name":"Construction News","article_publisher":"https:\/\/www.facebook.com\/CN.community","article_published_time":"2024-07-15T10:53:00+00:00","twitter_card":"summary","twitter_image":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/07\/Skanska-7-Millbank.jpg","twitter_creator":"@CNplus","twitter_site":"@CNplus","twitter_misc":{"Written by":"Joshua Stein","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/www.constructionnews.co.uk\/#website","url":"https:\/\/www.constructionnews.co.uk\/","name":"Construction News","description":"Read UK Construction Industry News, Analysis, Opinion and data","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-GB"},{"@type":"ImageObject","@id":"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-scoops-105m-office-development-15-07-2024\/#primaryimage","inLanguage":"en-GB","url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/07\/Skanska-7-Millbank.jpg","contentUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/07\/Skanska-7-Millbank.jpg","width":1024,"height":683},{"@type":"WebPage","@id":"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-scoops-105m-office-development-15-07-2024\/#webpage","url":"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-scoops-105m-office-development-15-07-2024\/","name":"Skanska scoops \u00a3105m office development | Construction News","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-scoops-105m-office-development-15-07-2024\/#primaryimage"},"datePublished":"2024-07-15T10:53:00+00:00","dateModified":"2024-07-15T10:53:00+00:00","author":{"@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc"},"description":"Skanska has secured the contract to replace a nine-storey office block overlooking London\u2019s River Thames, involving the reconstruction of the retained","breadcrumb":{"@id":"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-scoops-105m-office-development-15-07-2024\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-scoops-105m-office-development-15-07-2024\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionnews.co.uk\/contractors\/skanska\/skanska-scoops-105m-office-development-15-07-2024\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionnews.co.uk\/"},{"@type":"ListItem","position":2,"name":"Skanska scoops \u00a3105m office development"}]},{"@type":"Person","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/482eae6a8521cf09396402a7e955effc","name":"Joshua Stein","image":{"@type":"ImageObject","@id":"https:\/\/www.constructionnews.co.uk\/#personlogo","inLanguage":"en-GB","url":"https:\/\/secure.gravatar.com\/avatar\/8625f5ceef31a65fc91e25182beb7a92?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8625f5ceef31a65fc91e25182beb7a92?s=96&d=mm&r=g","caption":"Joshua Stein"},"url":"https:\/\/www.constructionnews.co.uk\/author\/joshua-stein\/"}]}},"_links":{"self":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/502308"}],"collection":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/users\/90643"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/comments?post=502308"}],"version-history":[{"count":8,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/502308\/revisions"}],"predecessor-version":[{"id":502345,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/502308\/revisions\/502345"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media\/502339"}],"wp:attachment":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media?parent=502308"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/categories?post=502308"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/tags?post=502308"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}