{"id":504271,"date":"2024-08-20T11:59:13","date_gmt":"2024-08-20T10:59:13","guid":{"rendered":"https:\/\/www.constructionnews.co.uk\/?p=504271"},"modified":"2024-08-20T11:59:13","modified_gmt":"2024-08-20T10:59:13","slug":"financial-squeeze-and-lack-of-data-holding-back-net-zero-progress","status":"publish","type":"post","link":"https:\/\/www.constructionnews.co.uk\/sustainability\/financial-squeeze-and-lack-of-data-holding-back-net-zero-progress-20-08-2024\/","title":{"rendered":"Financial squeeze and lack of data holding back net-zero progress"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">The construction industry has moved closer towards meeting its net-zero ambitions but tough finances and a lack of data are holding back further progress, research has suggested.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">According to the latest biennial <\/span><i><span style=\"font-weight: 400;\">NBS Sustainable Futures Report<\/span><\/i><span style=\"font-weight: 400;\">, nine out of 10 respondents worked on projects with sustainable outcome targets, with almost half (48 per cent) doing so at least most of the time.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Compared with the last report, published in 2022, there has been a 16 per cent increase in the proportion of organisations measuring their carbon footprint.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">And the poll of 568 professionals, including UK consultants, contractors and suppliers, found that 43 per cent believed sustainability was usually or always achieved on their projects \u2013 an increase of 10 percentage points.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">There was also optimism across all roles, with 89 per cent \u2013 the same percentage as in 2022 \u2013 predicting that their organisation would achieve net zero at some point.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The<\/span><a href=\"https:\/\/links.uk.defend.egress.com\/Warning?crId=66c43802af4f145a834cb5fb&amp;Domain=emap.com&amp;Lang=en&amp;Base64Url=eNolissKwjAURL_G5U1u0jQPwZUiKHVpwWWSpkhfSpNS-_cGHWZgzjDPlN5xT6kSU-nFqMhMwgJriAkYsWtMs_U9GQOtkP6_O37O9q9xjCQ9w-QiyZCnIUeVSrMiF45cAErgLIPQfdQfyiky5MgMk0FZp4KBRljX-taDlC0D0RQGnPEGvEWJXoiW6xLwJ-oqt8FwrOvuoW_qMsdluJ6ablvl_VBo9QUAfzrr&amp;@OriginalLink=74n5c4m7.r.eu-west-1.awstrack.me\"> <span style=\"font-weight: 400;\">research<\/span><\/a><span style=\"font-weight: 400;\"> was supported by Glenigan, the Chartered Institute of Building and the Royal Institute of British Architects.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">But the report also revealed that cost was now the biggest barrier to lowering emissions, mainly due to the \u201ctough economic landscape\u201d and the need to value-engineer projects to protect margins.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">It said: \u201cThe last few years have been particularly challenging, with high material price inflation and supply issues. If we are entering a period of stability with some hope of growth, then there might be more opportunity for clients to spend money on more sustainable products \u2013 even if the upfront costs are a little higher.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Some industry respondents, cited in the report, urged manufacturers to share more details about the sustainability of their products. This was critical to meeting new sustainability reporting demands set by the government, they said.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">NBS predicted further improvements would come from firms focusing on addressing embedded carbon at each stage of the build process and in the final building. This could be achieved by greater use of data, said<\/span><a href=\"https:\/\/www.constructionnews.co.uk\/sustainability\/how-can-we-meet-the-challenge-of-retrofitting-historic-buildings-20-08-2024\/\"> <span style=\"font-weight: 400;\">Anya Blanchfield<\/span><\/a><span style=\"font-weight: 400;\">, a sustainability engineer and net-zero consultant at consultancy McBains.<\/span><\/p>\n<p><a href=\"https:\/\/www.constructionnews.co.uk\/sustainability\/how-can-we-meet-the-challenge-of-retrofitting-historic-buildings-20-08-2024\/\"><span style=\"font-weight: 400;\">Writing in <\/span><i><span style=\"font-weight: 400;\">Construction News<\/span><\/i><span style=\"font-weight: 400;\">,<\/span><\/a> <span style=\"font-weight: 400;\">\u00a0she said more data use would improve results throughout the build process.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Blanchfield, who is also a BREEAM assessor, said:<\/span><i><span style=\"font-weight: 400;\"> \u201c<\/span><\/i><span style=\"font-weight: 400;\">A more accurate way of assessing a building\u2019s performance level would be to compare its data prior to its retrofit, and the same data after, once measures have been installed.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cThe type of modelling used in EPCs [Energy Performance Certificates] can be very valuable, but there can be performance gaps between what is simulated and what actually occurs due to assumptions in modelling, poor specification at design stage or below-average installation.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">She added: \u201cA more holistic approach would not simply look at the operational energy of a building, but would conduct an analysis that incorporated how much carbon was involved in the building works, including the embodied energy in the materials used in retrofitting, and the savings created by them.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Blanchfield also called for a wider rethink on demolition to instead make it the default choice to adapt existing buildings where possible, which in many instances would reduce carbon emissions.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">She said: \u201cWe need an industry-wide shift, with older buildings valued rather than knocked down. We have access to cutting-edge green technology and skilled contractors. The complexities of retrofitting historic buildings can be navigated and will result in a more sustainable future.\u201d<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The construction industry has moved closer towards meeting its net-zero ambitions but tough finances and a lack of data are holding back further progress, research has suggested. According to the latest biennial NBS Sustainable Futures Report, nine out of 10 respondents worked on projects with sustainable outcome targets, with almost half (48 per cent) doing &#8230;<\/p>\n","protected":false},"author":149995,"featured_media":476949,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ep_exclude_from_search":false},"categories":[78193,2164,556],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<meta name=\"description\" content=\"The construction industry is nearer its net zero targets but tough finances and a lack of data are limiting more gains, new research says.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionnews.co.uk\/sustainability\/financial-squeeze-and-lack-of-data-holding-back-net-zero-progress-20-08-2024\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Financial squeeze and lack of data holding back net-zero progress | Construction News\" \/>\n<meta property=\"og:description\" content=\"The construction industry is nearer its net zero targets but tough finances and a lack of data are limiting more gains, new research says.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionnews.co.uk\/sustainability\/financial-squeeze-and-lack-of-data-holding-back-net-zero-progress-20-08-2024\/\" \/>\n<meta property=\"og:site_name\" content=\"Construction News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/CN.community\" \/>\n<meta property=\"article:published_time\" content=\"2024-08-20T10:59:13+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/03\/NOCN_Accelerating-towards-net-zero.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@CNplus\" \/>\n<meta name=\"twitter:site\" content=\"@CNplus\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Chris Smith\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\",\"url\":\"https:\/\/www.constructionnews.co.uk\/\",\"name\":\"Construction News\",\"description\":\"Read UK Construction Industry News, Analysis, Opinion and data\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-GB\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/sustainability\/financial-squeeze-and-lack-of-data-holding-back-net-zero-progress-20-08-2024\/#primaryimage\",\"inLanguage\":\"en-GB\",\"url\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/03\/NOCN_Accelerating-towards-net-zero.jpg\",\"contentUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/03\/NOCN_Accelerating-towards-net-zero.jpg\",\"width\":1024,\"height\":683},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/sustainability\/financial-squeeze-and-lack-of-data-holding-back-net-zero-progress-20-08-2024\/#webpage\",\"url\":\"https:\/\/www.constructionnews.co.uk\/sustainability\/financial-squeeze-and-lack-of-data-holding-back-net-zero-progress-20-08-2024\/\",\"name\":\"Financial squeeze and lack of data holding back net-zero progress | Construction News\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/sustainability\/financial-squeeze-and-lack-of-data-holding-back-net-zero-progress-20-08-2024\/#primaryimage\"},\"datePublished\":\"2024-08-20T10:59:13+00:00\",\"dateModified\":\"2024-08-20T10:59:13+00:00\",\"author\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/46b0ba81120edcbb4d31fe490397a4de\"},\"description\":\"The construction industry is nearer its net zero targets but tough finances and a lack of data are limiting more gains, new research says.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/sustainability\/financial-squeeze-and-lack-of-data-holding-back-net-zero-progress-20-08-2024\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/sustainability\/financial-squeeze-and-lack-of-data-holding-back-net-zero-progress-20-08-2024\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/sustainability\/financial-squeeze-and-lack-of-data-holding-back-net-zero-progress-20-08-2024\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.constructionnews.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Financial squeeze and lack of data holding back net-zero progress\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/46b0ba81120edcbb4d31fe490397a4de\",\"name\":\"Chris Smith\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#personlogo\",\"inLanguage\":\"en-GB\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/8d55c8180c3ec9b91935298508f84179?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/8d55c8180c3ec9b91935298508f84179?s=96&d=mm&r=g\",\"caption\":\"Chris Smith\"},\"url\":\"https:\/\/www.constructionnews.co.uk\/author\/chris-smith-17\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"description":"The construction industry is nearer its net zero targets but tough finances and a lack of data are limiting more gains, new research says.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionnews.co.uk\/sustainability\/financial-squeeze-and-lack-of-data-holding-back-net-zero-progress-20-08-2024\/","og_locale":"en_GB","og_type":"article","og_title":"Financial squeeze and lack of data holding back net-zero progress | Construction News","og_description":"The construction industry is nearer its net zero targets but tough finances and a lack of data are limiting more gains, new research says.","og_url":"https:\/\/www.constructionnews.co.uk\/sustainability\/financial-squeeze-and-lack-of-data-holding-back-net-zero-progress-20-08-2024\/","og_site_name":"Construction News","article_publisher":"https:\/\/www.facebook.com\/CN.community","article_published_time":"2024-08-20T10:59:13+00:00","twitter_card":"summary","twitter_image":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/03\/NOCN_Accelerating-towards-net-zero.jpg","twitter_creator":"@CNplus","twitter_site":"@CNplus","twitter_misc":{"Written by":"Chris Smith","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/www.constructionnews.co.uk\/#website","url":"https:\/\/www.constructionnews.co.uk\/","name":"Construction News","description":"Read UK Construction Industry News, Analysis, Opinion and data","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-GB"},{"@type":"ImageObject","@id":"https:\/\/www.constructionnews.co.uk\/sustainability\/financial-squeeze-and-lack-of-data-holding-back-net-zero-progress-20-08-2024\/#primaryimage","inLanguage":"en-GB","url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/03\/NOCN_Accelerating-towards-net-zero.jpg","contentUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/03\/NOCN_Accelerating-towards-net-zero.jpg","width":1024,"height":683},{"@type":"WebPage","@id":"https:\/\/www.constructionnews.co.uk\/sustainability\/financial-squeeze-and-lack-of-data-holding-back-net-zero-progress-20-08-2024\/#webpage","url":"https:\/\/www.constructionnews.co.uk\/sustainability\/financial-squeeze-and-lack-of-data-holding-back-net-zero-progress-20-08-2024\/","name":"Financial squeeze and lack of data holding back net-zero progress | Construction News","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/sustainability\/financial-squeeze-and-lack-of-data-holding-back-net-zero-progress-20-08-2024\/#primaryimage"},"datePublished":"2024-08-20T10:59:13+00:00","dateModified":"2024-08-20T10:59:13+00:00","author":{"@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/46b0ba81120edcbb4d31fe490397a4de"},"description":"The construction industry is nearer its net zero targets but tough finances and a lack of data are limiting more gains, new research says.","breadcrumb":{"@id":"https:\/\/www.constructionnews.co.uk\/sustainability\/financial-squeeze-and-lack-of-data-holding-back-net-zero-progress-20-08-2024\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionnews.co.uk\/sustainability\/financial-squeeze-and-lack-of-data-holding-back-net-zero-progress-20-08-2024\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionnews.co.uk\/sustainability\/financial-squeeze-and-lack-of-data-holding-back-net-zero-progress-20-08-2024\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionnews.co.uk\/"},{"@type":"ListItem","position":2,"name":"Financial squeeze and lack of data holding back net-zero progress"}]},{"@type":"Person","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/46b0ba81120edcbb4d31fe490397a4de","name":"Chris Smith","image":{"@type":"ImageObject","@id":"https:\/\/www.constructionnews.co.uk\/#personlogo","inLanguage":"en-GB","url":"https:\/\/secure.gravatar.com\/avatar\/8d55c8180c3ec9b91935298508f84179?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8d55c8180c3ec9b91935298508f84179?s=96&d=mm&r=g","caption":"Chris Smith"},"url":"https:\/\/www.constructionnews.co.uk\/author\/chris-smith-17\/"}]}},"_links":{"self":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/504271"}],"collection":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/users\/149995"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/comments?post=504271"}],"version-history":[{"count":6,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/504271\/revisions"}],"predecessor-version":[{"id":504324,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/504271\/revisions\/504324"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media\/476949"}],"wp:attachment":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media?parent=504271"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/categories?post=504271"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/tags?post=504271"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}