{"id":510548,"date":"2024-12-04T11:01:47","date_gmt":"2024-12-04T11:01:47","guid":{"rendered":"https:\/\/www.constructionnews.co.uk\/?p=510548"},"modified":"2024-12-04T11:01:47","modified_gmt":"2024-12-04T11:01:47","slug":"costain-wins-400m-hs2-me-package","status":"publish","type":"post","link":"https:\/\/www.constructionnews.co.uk\/contractors\/costain\/costain-wins-400m-hs2-me-package-04-12-2024\/","title":{"rendered":"Costain wins \u00a3400m HS2 M&#038;E package"},"content":{"rendered":"<p>Costain has landed a \u00a3400m contract to deliver tunnel and lineside mechanical and electrical (M&amp;E) systems for HS2.<\/p>\n<p>Under the deal, the contractor will deliver the design, supply, manufacture, installation, testing and commissioning of HS2\u2019s tunnel and lineside M&amp;E systems during construction.<\/p>\n<p>Its work will start in Q1 2025 for a seven-year period, with an option for additional contract extensions.<\/p>\n<p>A statement from Costain said the M&amp;E systems installation will include services within the tunnels, plus cross-passages, low-voltage power services and distribution on the open part of the route. The company will also design, supply, install, test and commission the tunnel ventilation systems.<\/p>\n<p>Costain chief executive Alex Vaughan said: \u201cCostain has a long-standing involvement with the UK\u2019s largest strategic infrastructure programme and this new award is testament to the strength of our collaborative and successful relationship with HS2.<\/p>\n<p>\u201cOur teams will draw on their experience and expertise in delivering world-class M&amp;E systems, for example on Crossrail, and will use the latest technology to drive efficiency.\u201d<\/p>\n<p>He added: \u201cHS2 will be transformational for UK connectivity, freeing up capacity on the existing rail network and alleviating road traffic and congestion. It\u2019s a project that will continue to create jobs, develop skills and drive prosperity long after construction.\u201d<\/p>\n<p>The company has recently been trialling <a href=\"https:\/\/www.newcivilengineer.com\/latest\/pioneering-robotic-and-ai-tech-set-to-boost-productivity-of-services-installation-in-tunnels-by-40-15-05-2024\/\">AI robotics technology<\/a> that it said can automate and improve the efficiency and safety of tunnel M&amp;E installation.<\/p>\n<p>Last month <em>Construction News<\/em> sat down with Vaughan to look back at his 34 years working at Costain and five years leading the company.<\/p>\n<p>He said that the company focuses on transport, water, energy and defence sectors because investment in them is crucial for the country.<\/p>\n<p>\u201cThese are areas where investment has to happen, not just because they\u2019re profitable, but because they are essential to the country\u2019s economic growth and environmental resilience,\u201d he said.<\/p>\n<p><span data-teams=\"true\">Investment bank Investec responded to the latest announcement: \u201cAnother contract win enhances an already strong forward work position [for Costain]<\/span>. With the recent forward work position standing at \u00a34.8bn, this win should boost the position to in excess of \u00a35bn.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Costain has landed a \u00a3400m contract to deliver tunnel and lineside mechanical and electrical (M&amp;E) systems for HS2. Under the deal, the contractor will deliver the design, supply, manufacture, installation, testing and commissioning of HS2\u2019s tunnel and lineside M&amp;E systems during construction. Its work will start in Q1 2025 for a seven-year period, with an &#8230;<\/p>\n","protected":false},"author":43915,"featured_media":484909,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ep_exclude_from_search":false},"categories":[532,39314],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<meta name=\"description\" content=\"Costain has landed a \u00a3400m contract to deliver tunnel and lineside mechanical and electrical (M&amp;E) systems for HS2. Under the deal, the contractor\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionnews.co.uk\/contractors\/costain\/costain-wins-400m-hs2-me-package-04-12-2024\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Costain wins \u00a3400m HS2 M&amp;E package | Construction News\" \/>\n<meta property=\"og:description\" content=\"Costain has landed a \u00a3400m contract to deliver tunnel and lineside mechanical and electrical (M&amp;E) systems for HS2. Under the deal, the contractor\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionnews.co.uk\/contractors\/costain\/costain-wins-400m-hs2-me-package-04-12-2024\/\" \/>\n<meta property=\"og:site_name\" content=\"Construction News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/CN.community\" \/>\n<meta property=\"article:published_time\" content=\"2024-12-04T11:01:47+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/08\/Costain.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@CNplus\" \/>\n<meta name=\"twitter:site\" content=\"@CNplus\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ian Weinfass\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\",\"url\":\"https:\/\/www.constructionnews.co.uk\/\",\"name\":\"Construction News\",\"description\":\"Read UK Construction Industry News, Analysis, Opinion and data\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-GB\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/costain\/costain-wins-400m-hs2-me-package-04-12-2024\/#primaryimage\",\"inLanguage\":\"en-GB\",\"url\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/08\/Costain.jpg\",\"contentUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/08\/Costain.jpg\",\"width\":1024,\"height\":683},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/costain\/costain-wins-400m-hs2-me-package-04-12-2024\/#webpage\",\"url\":\"https:\/\/www.constructionnews.co.uk\/contractors\/costain\/costain-wins-400m-hs2-me-package-04-12-2024\/\",\"name\":\"Costain wins \u00a3400m HS2 M&E package | Construction News\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/costain\/costain-wins-400m-hs2-me-package-04-12-2024\/#primaryimage\"},\"datePublished\":\"2024-12-04T11:01:47+00:00\",\"dateModified\":\"2024-12-04T11:01:47+00:00\",\"author\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d6199e963b3c9f48fbde9a4b6ee1f14a\"},\"description\":\"Costain has landed a \u00a3400m contract to deliver tunnel and lineside mechanical and electrical (M&amp;E) systems for HS2. Under the deal, the contractor\",\"breadcrumb\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/costain\/costain-wins-400m-hs2-me-package-04-12-2024\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/contractors\/costain\/costain-wins-400m-hs2-me-package-04-12-2024\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/contractors\/costain\/costain-wins-400m-hs2-me-package-04-12-2024\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.constructionnews.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Costain wins \u00a3400m HS2 M&#038;E package\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d6199e963b3c9f48fbde9a4b6ee1f14a\",\"name\":\"Ian Weinfass\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#personlogo\",\"inLanguage\":\"en-GB\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/046cdd14c1109b6e9a76457bcf5e41c0?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/046cdd14c1109b6e9a76457bcf5e41c0?s=96&d=mm&r=g\",\"caption\":\"Ian Weinfass\"},\"description\":\"Ian is a regular contributor of news and features to Construction News and former deputy editor on the title. A British Journalism Awards finalist 2016 and 2023, Ian won the Feature Writer of the Year category at the International Building Press awards in 2023.\",\"url\":\"https:\/\/www.constructionnews.co.uk\/author\/ian-weinfass\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"description":"Costain has landed a \u00a3400m contract to deliver tunnel and lineside mechanical and electrical (M&amp;E) systems for HS2. Under the deal, the contractor","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionnews.co.uk\/contractors\/costain\/costain-wins-400m-hs2-me-package-04-12-2024\/","og_locale":"en_GB","og_type":"article","og_title":"Costain wins \u00a3400m HS2 M&E package | Construction News","og_description":"Costain has landed a \u00a3400m contract to deliver tunnel and lineside mechanical and electrical (M&amp;E) systems for HS2. Under the deal, the contractor","og_url":"https:\/\/www.constructionnews.co.uk\/contractors\/costain\/costain-wins-400m-hs2-me-package-04-12-2024\/","og_site_name":"Construction News","article_publisher":"https:\/\/www.facebook.com\/CN.community","article_published_time":"2024-12-04T11:01:47+00:00","twitter_card":"summary","twitter_image":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/08\/Costain.jpg","twitter_creator":"@CNplus","twitter_site":"@CNplus","twitter_misc":{"Written by":"Ian Weinfass","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/www.constructionnews.co.uk\/#website","url":"https:\/\/www.constructionnews.co.uk\/","name":"Construction News","description":"Read UK Construction Industry News, Analysis, Opinion and data","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-GB"},{"@type":"ImageObject","@id":"https:\/\/www.constructionnews.co.uk\/contractors\/costain\/costain-wins-400m-hs2-me-package-04-12-2024\/#primaryimage","inLanguage":"en-GB","url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/08\/Costain.jpg","contentUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/08\/Costain.jpg","width":1024,"height":683},{"@type":"WebPage","@id":"https:\/\/www.constructionnews.co.uk\/contractors\/costain\/costain-wins-400m-hs2-me-package-04-12-2024\/#webpage","url":"https:\/\/www.constructionnews.co.uk\/contractors\/costain\/costain-wins-400m-hs2-me-package-04-12-2024\/","name":"Costain wins \u00a3400m HS2 M&E package | Construction News","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/contractors\/costain\/costain-wins-400m-hs2-me-package-04-12-2024\/#primaryimage"},"datePublished":"2024-12-04T11:01:47+00:00","dateModified":"2024-12-04T11:01:47+00:00","author":{"@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d6199e963b3c9f48fbde9a4b6ee1f14a"},"description":"Costain has landed a \u00a3400m contract to deliver tunnel and lineside mechanical and electrical (M&amp;E) systems for HS2. Under the deal, the contractor","breadcrumb":{"@id":"https:\/\/www.constructionnews.co.uk\/contractors\/costain\/costain-wins-400m-hs2-me-package-04-12-2024\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionnews.co.uk\/contractors\/costain\/costain-wins-400m-hs2-me-package-04-12-2024\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionnews.co.uk\/contractors\/costain\/costain-wins-400m-hs2-me-package-04-12-2024\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionnews.co.uk\/"},{"@type":"ListItem","position":2,"name":"Costain wins \u00a3400m HS2 M&#038;E package"}]},{"@type":"Person","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d6199e963b3c9f48fbde9a4b6ee1f14a","name":"Ian Weinfass","image":{"@type":"ImageObject","@id":"https:\/\/www.constructionnews.co.uk\/#personlogo","inLanguage":"en-GB","url":"https:\/\/secure.gravatar.com\/avatar\/046cdd14c1109b6e9a76457bcf5e41c0?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/046cdd14c1109b6e9a76457bcf5e41c0?s=96&d=mm&r=g","caption":"Ian Weinfass"},"description":"Ian is a regular contributor of news and features to Construction News and former deputy editor on the title. A British Journalism Awards finalist 2016 and 2023, Ian won the Feature Writer of the Year category at the International Building Press awards in 2023.","url":"https:\/\/www.constructionnews.co.uk\/author\/ian-weinfass\/"}]}},"_links":{"self":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/510548"}],"collection":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/users\/43915"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/comments?post=510548"}],"version-history":[{"count":5,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/510548\/revisions"}],"predecessor-version":[{"id":510555,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/510548\/revisions\/510555"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media\/484909"}],"wp:attachment":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media?parent=510548"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/categories?post=510548"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/tags?post=510548"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}