{"id":510724,"date":"2024-12-06T12:48:10","date_gmt":"2024-12-06T12:48:10","guid":{"rendered":"https:\/\/www.constructionnews.co.uk\/?p=510724"},"modified":"2024-12-06T16:57:22","modified_gmt":"2024-12-06T16:57:22","slug":"calls-for-more-research-into-modular-constructions-fire-safety","status":"publish","type":"post","link":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/calls-for-more-research-into-modular-constructions-fire-safety-06-12-2024\/","title":{"rendered":"Calls for more research into modular construction\u2019s fire safety"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">Two newly published reports have called for more research into the fire-safety performance of volumetric modular construction.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">In a report commissioned by the government, researchers at Harlow Consulting and Edinburgh Napier University warn that there is no standard fire-test method that is directly applicable for volumetric construction.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">It says that the testing that does take place is therefore likely to be suboptimal.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Volumetric modular construction (VMC), also known as category 1 modular, is a type of modern method of construction (MMC) where three-dimensional units are manufactured off site, then transported to and assembled on site.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The method is<\/span><a href=\"https:\/\/www.constructionnews.co.uk\/financial\/public-sector-work-spurs-exceptional-growth-for-modular-builder-22-10-2024\/\"> <span style=\"font-weight: 400;\">increasingly being used by Whitehall departments, including the Ministry of Defence<\/span><\/a><span style=\"font-weight: 400;\">, as a means of speeding up the delivery of projects, as well as cutting waste and costs.<\/span><\/p>\n<p><a href=\"https:\/\/www.constructionnews.co.uk\/health-and-safety\/mmc-fire-chiefs-demand-new-safety-rules-08-12-2022\/\"><span style=\"font-weight: 400;\">Two years ago<\/span><\/a><span style=\"font-weight: 400;\">, the National Fire Chiefs Council called for the introduction of specific safety regulations and legislation relating to MMC, and for it to be specifically addressed under the Building Safety Act.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The government did not do either of those things, although it subsequently announced a new standard for homes built using MMC.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The Harlow Consulting and Edinburgh Napier report, published last week, says: \u201cWhile there is insufficient evidence to suggest whether a fire is more or less likely in a modular building compared with a traditionally constructed building, the event of a serious fire is likely to result in more serious consequences in a modular building if the choice has been made to use combustible elements in the voids and cavities through which fire and smoke can travel quickly \u2013 unless these risks are mitigated via appropriate design, manufacture and installation<\/span><b>.<\/b><\/p>\n<p><span style=\"font-weight: 400;\">\u201cFurther research is critical to have a clearer understanding of how materials (and combinations of materials\/components) behave in modular buildings in the event of a fire, to feed into [the] development of a standard fire testing methodology for volumetric construction.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Meanwhile, the Health and Safety Executive\/Building Safety Regulator (HSE\/BSR) published a research paper this week, based largely on reviews of other literature and from media reports, highlighting a number of potential fire-risk issues relating to the method.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">These include missing or incorrectly installed cavity barriers, defects found in fire doors, penetrations through compartment walls that are not correctly firestopped, and hidden voids.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">However, it notes: \u201cSome of these issues could also relate to other (non-VMC) builds and there is no evidence to suggest whether the frequency of the issues would be higher or the consequences of the issues more severe in relation to VMC compared to other types of construction.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Incidents it cites include a fire that destroyed the The Moorfield Hotel in Shetland (pictured) in 2020, which was a modular building made of timber.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">It says that potential future steps could include fire and structural testing of modules in a way that better represents the typical contexts of these modules than existing tests do, ie, stacked or part of a hybrid structure.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cThis would help identify the consequences of any building safety issues in comparison to traditional (non-VMC) builds,\u201d it adds.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cTesting should include timber VMC to determine the nature of potential risks of VMC overlapping with the potential building safety risks of timber structures. Such tests might have implications for existing buildings and may inform any urgent concerns about PVMC [prefabricated volumetric modular construction].\u201d<\/span><\/p>\n<div>A National Fire Chiefs Council (NFCC) spokesperson said: \u201cWe recognise the role MMC can have in helping to deliver more homes quickly and sustainably. However,\u00a0NFCC is concerned that MMC buildings are being designed, approved and built despite a lack of understanding about their performance.<\/div>\n<div><\/div>\n<div>&#8220;It is vitally important to make sure that products and technologies are safe for use, including their likely performance in a fire, before they are used in the built environment. Not only is this important for safety but it also helps to protect leaseholders from unnecessary costs that can arise when buildings need remediation, or interim measures, including provisions like waking watches.&#8221;<\/div>\n<p><a href=\"https:\/\/www.constructionnews.co.uk\/tech\/offsite-mmc\/how-do-we-make-modular-buildings-safer-13-09-2023\/\"><span style=\"font-weight: 400;\">Last year, <\/span><i><span style=\"font-weight: 400;\">Construction News<\/span><\/i><span style=\"font-weight: 400;\"> published an in-depth report<\/span><\/a><span style=\"font-weight: 400;\"> on whether measures announced by the government up to that point would be enough to make MMC buildings safer.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The Harlow Consulting and Edinburgh Napier report examines other issues relating to MMC, including procurement and project management. It was finalised in July 2022 but only published by the government last week.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The HSE\/BSR report, based on research carried out up until October 2023, was also published last week.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Two newly published reports have called for more research into the fire-safety performance of volumetric modular construction. In a report commissioned by the government, researchers at Harlow Consulting and Edinburgh Napier University warn that there is no standard fire-test method that is directly applicable for volumetric construction. It says that the testing that does take &#8230;<\/p>\n","protected":false},"author":43915,"featured_media":484946,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ep_exclude_from_search":false},"categories":[79552,565,581,39315],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<meta name=\"description\" content=\"Two newly published reports have called for more research into the fire-safety performance of volumetric modular construction. In a report commissioned by\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/calls-for-more-research-into-modular-constructions-fire-safety-06-12-2024\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Calls for more research into modular construction\u2019s fire safety | Construction News\" \/>\n<meta property=\"og:description\" content=\"Two newly published reports have called for more research into the fire-safety performance of volumetric modular construction. In a report commissioned by\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/calls-for-more-research-into-modular-constructions-fire-safety-06-12-2024\/\" \/>\n<meta property=\"og:site_name\" content=\"Construction News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/CN.community\" \/>\n<meta property=\"article:published_time\" content=\"2024-12-06T12:48:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-06T16:57:22+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/08\/Moorfield-Hotel-shutterstock_1809247849.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@CNplus\" \/>\n<meta name=\"twitter:site\" content=\"@CNplus\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ian Weinfass\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\",\"url\":\"https:\/\/www.constructionnews.co.uk\/\",\"name\":\"Construction News\",\"description\":\"Read UK Construction Industry News, Analysis, Opinion and data\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-GB\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/calls-for-more-research-into-modular-constructions-fire-safety-06-12-2024\/#primaryimage\",\"inLanguage\":\"en-GB\",\"url\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/08\/Moorfield-Hotel-shutterstock_1809247849.jpg\",\"contentUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/08\/Moorfield-Hotel-shutterstock_1809247849.jpg\",\"width\":1024,\"height\":683,\"caption\":\"The Moorfield Hotel in Shetland was destroyed by fire in 2020. The hotel was built using modular methods\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/calls-for-more-research-into-modular-constructions-fire-safety-06-12-2024\/#webpage\",\"url\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/calls-for-more-research-into-modular-constructions-fire-safety-06-12-2024\/\",\"name\":\"Calls for more research into modular construction\u2019s fire safety | Construction News\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/calls-for-more-research-into-modular-constructions-fire-safety-06-12-2024\/#primaryimage\"},\"datePublished\":\"2024-12-06T12:48:10+00:00\",\"dateModified\":\"2024-12-06T16:57:22+00:00\",\"author\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d6199e963b3c9f48fbde9a4b6ee1f14a\"},\"description\":\"Two newly published reports have called for more research into the fire-safety performance of volumetric modular construction. In a report commissioned by\",\"breadcrumb\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/calls-for-more-research-into-modular-constructions-fire-safety-06-12-2024\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/calls-for-more-research-into-modular-constructions-fire-safety-06-12-2024\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/calls-for-more-research-into-modular-constructions-fire-safety-06-12-2024\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.constructionnews.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Calls for more research into modular construction\u2019s fire safety\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d6199e963b3c9f48fbde9a4b6ee1f14a\",\"name\":\"Ian Weinfass\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#personlogo\",\"inLanguage\":\"en-GB\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/046cdd14c1109b6e9a76457bcf5e41c0?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/046cdd14c1109b6e9a76457bcf5e41c0?s=96&d=mm&r=g\",\"caption\":\"Ian Weinfass\"},\"description\":\"Ian is a regular contributor of news and features to Construction News and former deputy editor on the title. A British Journalism Awards finalist 2016 and 2023, Ian won the Feature Writer of the Year category at the International Building Press awards in 2023.\",\"url\":\"https:\/\/www.constructionnews.co.uk\/author\/ian-weinfass\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"description":"Two newly published reports have called for more research into the fire-safety performance of volumetric modular construction. In a report commissioned by","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/calls-for-more-research-into-modular-constructions-fire-safety-06-12-2024\/","og_locale":"en_GB","og_type":"article","og_title":"Calls for more research into modular construction\u2019s fire safety | Construction News","og_description":"Two newly published reports have called for more research into the fire-safety performance of volumetric modular construction. In a report commissioned by","og_url":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/calls-for-more-research-into-modular-constructions-fire-safety-06-12-2024\/","og_site_name":"Construction News","article_publisher":"https:\/\/www.facebook.com\/CN.community","article_published_time":"2024-12-06T12:48:10+00:00","article_modified_time":"2024-12-06T16:57:22+00:00","twitter_card":"summary","twitter_image":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/08\/Moorfield-Hotel-shutterstock_1809247849.jpg","twitter_creator":"@CNplus","twitter_site":"@CNplus","twitter_misc":{"Written by":"Ian Weinfass","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/www.constructionnews.co.uk\/#website","url":"https:\/\/www.constructionnews.co.uk\/","name":"Construction News","description":"Read UK Construction Industry News, Analysis, Opinion and data","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-GB"},{"@type":"ImageObject","@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/calls-for-more-research-into-modular-constructions-fire-safety-06-12-2024\/#primaryimage","inLanguage":"en-GB","url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/08\/Moorfield-Hotel-shutterstock_1809247849.jpg","contentUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2023\/08\/Moorfield-Hotel-shutterstock_1809247849.jpg","width":1024,"height":683,"caption":"The Moorfield Hotel in Shetland was destroyed by fire in 2020. The hotel was built using modular methods"},{"@type":"WebPage","@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/calls-for-more-research-into-modular-constructions-fire-safety-06-12-2024\/#webpage","url":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/calls-for-more-research-into-modular-constructions-fire-safety-06-12-2024\/","name":"Calls for more research into modular construction\u2019s fire safety | Construction News","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/calls-for-more-research-into-modular-constructions-fire-safety-06-12-2024\/#primaryimage"},"datePublished":"2024-12-06T12:48:10+00:00","dateModified":"2024-12-06T16:57:22+00:00","author":{"@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d6199e963b3c9f48fbde9a4b6ee1f14a"},"description":"Two newly published reports have called for more research into the fire-safety performance of volumetric modular construction. In a report commissioned by","breadcrumb":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/calls-for-more-research-into-modular-constructions-fire-safety-06-12-2024\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/calls-for-more-research-into-modular-constructions-fire-safety-06-12-2024\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/calls-for-more-research-into-modular-constructions-fire-safety-06-12-2024\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionnews.co.uk\/"},{"@type":"ListItem","position":2,"name":"Calls for more research into modular construction\u2019s fire safety"}]},{"@type":"Person","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d6199e963b3c9f48fbde9a4b6ee1f14a","name":"Ian Weinfass","image":{"@type":"ImageObject","@id":"https:\/\/www.constructionnews.co.uk\/#personlogo","inLanguage":"en-GB","url":"https:\/\/secure.gravatar.com\/avatar\/046cdd14c1109b6e9a76457bcf5e41c0?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/046cdd14c1109b6e9a76457bcf5e41c0?s=96&d=mm&r=g","caption":"Ian Weinfass"},"description":"Ian is a regular contributor of news and features to Construction News and former deputy editor on the title. A British Journalism Awards finalist 2016 and 2023, Ian won the Feature Writer of the Year category at the International Building Press awards in 2023.","url":"https:\/\/www.constructionnews.co.uk\/author\/ian-weinfass\/"}]}},"_links":{"self":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/510724"}],"collection":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/users\/43915"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/comments?post=510724"}],"version-history":[{"count":10,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/510724\/revisions"}],"predecessor-version":[{"id":510773,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/510724\/revisions\/510773"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media\/484946"}],"wp:attachment":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media?parent=510724"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/categories?post=510724"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/tags?post=510724"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}