{"id":518523,"date":"2025-04-11T12:45:09","date_gmt":"2025-04-11T11:45:09","guid":{"rendered":"https:\/\/www.constructionnews.co.uk\/?p=518523"},"modified":"2025-04-11T14:33:53","modified_gmt":"2025-04-11T13:33:53","slug":"full-details-of-bsr-framework-revealed","status":"publish","type":"post","link":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/full-details-of-bsr-framework-revealed-11-04-2025\/","title":{"rendered":"Full details of BSR framework revealed"},"content":{"rendered":"<p>There were no unsuccessful tenders to win places on the Building Safety Regulator\u2019s (BSR\u2019s) higher-risk building framework, <em>Construction News<\/em> can reveal.<\/p>\n<p>Seven companies won places on the framework in October 2023 <a href=\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/concerns-raised-over-bsrs-frameworks-process-18-11-2024\/\">with LB Building Control winning an extra place last year<\/a>, the BSR said.<\/p>\n<p>The framework sees the companies carry out tasks such as building control certification and approved inspection work that the regulator does not have the resources to carry out itself.<\/p>\n<p>A full list of companies awarded places on the framework has never before been published and was made available to <em>CN<\/em> after a warning by the Information Commissioner\u2019s Office (see box below).<\/p>\n<p>A Freedom of Information response shows Aecom, Arup, <span data-teams=\"true\">Bureau Veritas<\/span>, the National House Building Council (NHBC), Socotec, Stroma Building Control and WSP landed places on the framework in 2023 for three-and-a-half years, with an option to extend for another three years.<\/p>\n<p>LB Building Control, a subsidiary of Assent BC, was appointed in 2024 for two-and-a-half years, also with an option to extend by three more years.<\/p>\n<p>Their contracts are on a call-off basis so there is no set contract value in place.<\/p>\n<p>The response said that bids were assessed by putting a 60 per cent weighting on quality, 30 per cent on price and 10 per cent on social value.<\/p>\n<p>However, it added that no companies submitted unsuccessful tenders for the work.<\/p>\n<p>The NHBC was among the bodies criticised in <a href=\"https:\/\/www.grenfelltowerinquiry.org.uk\/sites\/default\/files\/CCS0923434692-004_GTI%20Phase%202_Report%20Overview_E-Laying_0.pdf\">phase two of the Grenfell Tower report<\/a>, which said it failed to ensure its building control function \u201cremained free of commercial pressures\u201d.<\/p>\n<p>\u201cIt was unwilling to upset its own customers and the wider construction industry by revealing the scale of the use of combustible insulation in the external walls of high-rise buildings, contrary to the statutory guidance,\u201d it said, concluding there was a conflict between commercial interests and the regulatory function of building control.<\/p>\n<p>One industry figure told <em>CN <\/em>that the BSR\u2019s higher-risk building system was \u201cfailing\u201d.<\/p>\n<p>\u201cApproval times are not within required deadlines and the process is causing delays and obstruction to many schemes, potentially leading to a slowdown of the high-rise residential market and investor looking elsewhere for development,\u201d he said.<\/p>\n<p>The source added that the BSR having to turn to the private sector for its resources showed the \u201cstate of building control at present\u201d, adding that the loss of experience and resource in both the public and private sectors, and a shortage of class 3 registered building inspectors (RBIs) were problematic.<\/p>\n<p>\u201cNHBC being directly criticised during the Grenfell Inquiry does not look good on the BSR, but truly it appears their hands are tied due to the lack of available resource,&#8221; he said.<\/p>\n<p>\u201cUnless the BSR engages directly with RBIs rather than the organisations they work for, I do not see this changing anytime soon.\u201d<\/p>\n<p>A BSR spokesperson said that reforms of the building control profession since Grenfell have fundamentally changed the way that building control operates and the NHBC has become a r<span data-olk-copy-source=\"MessageBody\">egistered building control approver, which meant it has been assessed as meeting the required standards.<\/span><\/p>\n<p>They added that while the contracted companies provide technical expertise, BSR remains the decision-making body.<\/p>\n<p>&#8220;<span class=\"x_normaltextrun\"><span data-olk-copy-source=\"MessageBody\">NHBC are the largest building control body in England and, whilst the government is actively considering its relationship with those named in the inquiry, it remains appropriate that the BSR judiciously draws upon the expertise of its inspectors to support its work.<\/span><\/span><span class=\"x_eop\">\u00a0<\/span><\/p>\n<p class=\"x_paragraph\"><span class=\"x_normaltextrun\">&#8220;The government is currently considering the nature of the relationship with those named in the Inquiry and the BSR will reflect the outcomes in all future work. In the meantime, BSR will continue to meet its obligations under the agreed framework terms,&#8221; they said.<\/span><\/p>\n<p>On delays to the approvals process, they added that 70 per cent of applications are rejected because they do not demonstrate compliance with building regulations.<\/p>\n<p>&#8220;<span class=\"x_normaltextrun\"><span data-olk-copy-source=\"MessageBody\">We acknowledge there have been delays to processing approvals for building control applications and we are working to put this right,&#8221; they added, stating that as of February the processing time for higher-risk buildings under gateway 2 has decreased to 16 weeks on average.<\/span><\/span><\/p>\n<div class=\"factfile\">\n<h3>HSE warned over contempt of court<\/h3>\n<p>In November, the BSR \u2013 part of the Health and Safety Executive (HSE) \u2013 declined to answer questions about its procurement process for the framework after <a href=\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/concerns-raised-over-bsrs-frameworks-process-18-11-2024\/\"><em>CN<\/em> reported on concerns raised in the industry about its function and transparency<\/a>.<\/p>\n<p><em>CN<\/em> then submitted a Freedom of Information request on the topic \u2013 asking for details of the companies appointed, the framework itself, the process that the BSE ran to appoint them and how many unsuccessful tenders there had been.<\/p>\n<p>The HSE did not respond to it within 20 working days, as required by law.<\/p>\n<p>In February, enforcement body the Information Commissioner\u2019s Office contacted the organisation to ask it to respond within 10 working days, but it did not do so.<\/p>\n<p>Last month, the Information Commissioner found the HSE to have breached section 10 of the Freedom of Information Act 2000 and ordered it to respond within 30 calendar days, warning that a failure to do so risked being treated as contempt of court.<\/p>\n<p>The response was received 10 days later.<\/p>\n<p><a href=\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/concerns-raised-over-bsrs-frameworks-process-18-11-2024\/\">In November<\/a>, a spokesperson for the BSR said: \u201cWe are committed to transparency.\u201d<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>There were no unsuccessful tenders to win places on the Building Safety Regulator\u2019s (BSR\u2019s) higher-risk building framework, Construction News can reveal. Seven companies won places on the framework in October 2023 with LB Building Control winning an extra place last year, the BSR said. The framework sees the companies carry out tasks such as building &#8230;<\/p>\n","protected":false},"author":43915,"featured_media":495032,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ep_exclude_from_search":false},"categories":[79552,578],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<meta name=\"description\" content=\"There were no unsuccessful tenders to win places on the Building Safety Regulator\u2019s (BSR\u2019s) higher-risk building framework, Construction News can reveal.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/full-details-of-bsr-framework-revealed-11-04-2025\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Full details of BSR framework revealed | Construction News\" \/>\n<meta property=\"og:description\" content=\"There were no unsuccessful tenders to win places on the Building Safety Regulator\u2019s (BSR\u2019s) higher-risk building framework, Construction News can reveal.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/full-details-of-bsr-framework-revealed-11-04-2025\/\" \/>\n<meta property=\"og:site_name\" content=\"Construction News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/CN.community\" \/>\n<meta property=\"article:published_time\" content=\"2025-04-11T11:45:09+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-04-11T13:33:53+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/02\/Building-inspector_surveyor_building-control_shutterstock.jpg\" \/>\n<meta name=\"twitter:creator\" content=\"@CNplus\" \/>\n<meta name=\"twitter:site\" content=\"@CNplus\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ian Weinfass\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\",\"url\":\"https:\/\/www.constructionnews.co.uk\/\",\"name\":\"Construction News\",\"description\":\"Read UK Construction Industry News, Analysis, Opinion and data\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-GB\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/full-details-of-bsr-framework-revealed-11-04-2025\/#primaryimage\",\"inLanguage\":\"en-GB\",\"url\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/02\/Building-inspector_surveyor_building-control_shutterstock.jpg\",\"contentUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/02\/Building-inspector_surveyor_building-control_shutterstock.jpg\",\"width\":1024,\"height\":683},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/full-details-of-bsr-framework-revealed-11-04-2025\/#webpage\",\"url\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/full-details-of-bsr-framework-revealed-11-04-2025\/\",\"name\":\"Full details of BSR framework revealed | Construction News\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/full-details-of-bsr-framework-revealed-11-04-2025\/#primaryimage\"},\"datePublished\":\"2025-04-11T11:45:09+00:00\",\"dateModified\":\"2025-04-11T13:33:53+00:00\",\"author\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d6199e963b3c9f48fbde9a4b6ee1f14a\"},\"description\":\"There were no unsuccessful tenders to win places on the Building Safety Regulator\u2019s (BSR\u2019s) higher-risk building framework, Construction News can reveal.\",\"breadcrumb\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/full-details-of-bsr-framework-revealed-11-04-2025\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/full-details-of-bsr-framework-revealed-11-04-2025\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/full-details-of-bsr-framework-revealed-11-04-2025\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.constructionnews.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Full details of BSR framework revealed\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d6199e963b3c9f48fbde9a4b6ee1f14a\",\"name\":\"Ian Weinfass\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#personlogo\",\"inLanguage\":\"en-GB\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/046cdd14c1109b6e9a76457bcf5e41c0?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/046cdd14c1109b6e9a76457bcf5e41c0?s=96&d=mm&r=g\",\"caption\":\"Ian Weinfass\"},\"description\":\"Ian is a regular contributor of news and features to Construction News and former deputy editor on the title. A British Journalism Awards finalist 2016 and 2023, Ian won the Feature Writer of the Year category at the International Building Press awards in 2023.\",\"url\":\"https:\/\/www.constructionnews.co.uk\/author\/ian-weinfass\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"description":"There were no unsuccessful tenders to win places on the Building Safety Regulator\u2019s (BSR\u2019s) higher-risk building framework, Construction News can reveal.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/full-details-of-bsr-framework-revealed-11-04-2025\/","og_locale":"en_GB","og_type":"article","og_title":"Full details of BSR framework revealed | Construction News","og_description":"There were no unsuccessful tenders to win places on the Building Safety Regulator\u2019s (BSR\u2019s) higher-risk building framework, Construction News can reveal.","og_url":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/full-details-of-bsr-framework-revealed-11-04-2025\/","og_site_name":"Construction News","article_publisher":"https:\/\/www.facebook.com\/CN.community","article_published_time":"2025-04-11T11:45:09+00:00","article_modified_time":"2025-04-11T13:33:53+00:00","twitter_card":"summary","twitter_image":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/02\/Building-inspector_surveyor_building-control_shutterstock.jpg","twitter_creator":"@CNplus","twitter_site":"@CNplus","twitter_misc":{"Written by":"Ian Weinfass","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/www.constructionnews.co.uk\/#website","url":"https:\/\/www.constructionnews.co.uk\/","name":"Construction News","description":"Read UK Construction Industry News, Analysis, Opinion and data","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-GB"},{"@type":"ImageObject","@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/full-details-of-bsr-framework-revealed-11-04-2025\/#primaryimage","inLanguage":"en-GB","url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/02\/Building-inspector_surveyor_building-control_shutterstock.jpg","contentUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2024\/02\/Building-inspector_surveyor_building-control_shutterstock.jpg","width":1024,"height":683},{"@type":"WebPage","@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/full-details-of-bsr-framework-revealed-11-04-2025\/#webpage","url":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/full-details-of-bsr-framework-revealed-11-04-2025\/","name":"Full details of BSR framework revealed | Construction News","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/full-details-of-bsr-framework-revealed-11-04-2025\/#primaryimage"},"datePublished":"2025-04-11T11:45:09+00:00","dateModified":"2025-04-11T13:33:53+00:00","author":{"@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d6199e963b3c9f48fbde9a4b6ee1f14a"},"description":"There were no unsuccessful tenders to win places on the Building Safety Regulator\u2019s (BSR\u2019s) higher-risk building framework, Construction News can reveal.","breadcrumb":{"@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/full-details-of-bsr-framework-revealed-11-04-2025\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/full-details-of-bsr-framework-revealed-11-04-2025\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionnews.co.uk\/buildings\/building-safety\/full-details-of-bsr-framework-revealed-11-04-2025\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionnews.co.uk\/"},{"@type":"ListItem","position":2,"name":"Full details of BSR framework revealed"}]},{"@type":"Person","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d6199e963b3c9f48fbde9a4b6ee1f14a","name":"Ian Weinfass","image":{"@type":"ImageObject","@id":"https:\/\/www.constructionnews.co.uk\/#personlogo","inLanguage":"en-GB","url":"https:\/\/secure.gravatar.com\/avatar\/046cdd14c1109b6e9a76457bcf5e41c0?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/046cdd14c1109b6e9a76457bcf5e41c0?s=96&d=mm&r=g","caption":"Ian Weinfass"},"description":"Ian is a regular contributor of news and features to Construction News and former deputy editor on the title. A British Journalism Awards finalist 2016 and 2023, Ian won the Feature Writer of the Year category at the International Building Press awards in 2023.","url":"https:\/\/www.constructionnews.co.uk\/author\/ian-weinfass\/"}]}},"_links":{"self":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/518523"}],"collection":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/users\/43915"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/comments?post=518523"}],"version-history":[{"count":9,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/518523\/revisions"}],"predecessor-version":[{"id":518563,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/518523\/revisions\/518563"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media\/495032"}],"wp:attachment":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media?parent=518523"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/categories?post=518523"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/tags?post=518523"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}