{"id":519845,"date":"2025-05-06T10:20:49","date_gmt":"2025-05-06T09:20:49","guid":{"rendered":"https:\/\/www.constructionnews.co.uk\/?p=519845"},"modified":"2025-05-06T10:20:49","modified_gmt":"2025-05-06T09:20:49","slug":"authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station","status":"publish","type":"post","link":"https:\/\/www.constructionnews.co.uk\/civils\/authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station-06-05-2025\/","title":{"rendered":"Authority mulls reappointing contractor to stalled Leeds rail station"},"content":{"rendered":"<p>The West Yorkshire Combined Authority (WYCA) is due to consider whether to reappoint the same contractor as it looks to restart a stalled railway scheme that is 70 per cent complete.<\/p>\n<p>Work to build White Rose Station, close to White Rose business park and White Rose shopping centre in south-west Leeds, took place from March 2022 until the spring of 2024.<\/p>\n<p>Main contractor Spencer Group carried out the job on behalf of the WYCA and developer Munroe K under a \u00a326.5m budget.<\/p>\n<p>The entire budget, including its contingency, was used up before the project came to a halt, with the WYCA blaming the post-Covid and Brexit period for \u201cunprecedented cost inflation and [\u2026] significant programme slippage\u201d.<\/p>\n<p>Tasks that still need to be finished include cladding, fit-out, mechanical, electrical and plumbing, installation of lifts and customer information systems, and operational railway work such as signalling.<\/p>\n<p>Councillors at the combined authority are set to decide whether to provide funding to finish the scheme and work on a strategy at a meeting on Thursday (8 May).<\/p>\n<p>The lack of progress on the station is set to have a knock-on effect on wider work on the Network Rail-led TransPennine Route Upgrade set to connect to the same stretch of line by the end of 2026, especially at Cottingley.<\/p>\n<p>A report prepared by Network Rail to help WYCA decide how to proceed described the build carried out to date as being done to \u201ca high standard\u201d.<\/p>\n<p>It has also provided the authority with \u201ca high-level strengths and weaknesses assessment\u201d of whether Spencer Group should complete the project or whether \u201can alternative delivery route\u201d should be pursued.<\/p>\n<p>Its report has not been made public, but according to a document published by the WYCA ahead of the meeting, the station could be open by January 2027 if a decision is made quickly, which would mitigate the impact on the TransPennine Route Upgrade works.<\/p>\n<p>If the authority approves plans to further fund the scheme, another report is set to be brought to its members in July outlining how much is actually needed, and will give further details of the approach to be taken to complete the work.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The West Yorkshire Combined Authority (WYCA) is due to consider whether to reappoint the same contractor as it looks to restart a stalled railway scheme that is 70 per cent complete. Work to build White Rose Station, close to White Rose business park and White Rose shopping centre in south-west Leeds, took place from March &#8230;<\/p>\n","protected":false},"author":43915,"featured_media":349931,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ep_exclude_from_search":false},"categories":[549],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<meta name=\"description\" content=\"The West Yorkshire Combined Authority (WYCA) is due to consider whether to reappoint the same contractor as it looks to restart a stalled railway scheme\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionnews.co.uk\/civils\/authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station-06-05-2025\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Authority mulls reappointing contractor to stalled Leeds rail station | Construction News\" \/>\n<meta property=\"og:description\" content=\"The West Yorkshire Combined Authority (WYCA) is due to consider whether to reappoint the same contractor as it looks to restart a stalled railway scheme\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionnews.co.uk\/civils\/authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station-06-05-2025\/\" \/>\n<meta property=\"og:site_name\" content=\"Construction News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/CN.community\" \/>\n<meta property=\"article:published_time\" content=\"2025-05-06T09:20:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2015\/12\/Transpennine-West-Electrification-image-1024x683.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary\" \/>\n<meta name=\"twitter:creator\" content=\"@CNplus\" \/>\n<meta name=\"twitter:site\" content=\"@CNplus\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ian Weinfass\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\",\"url\":\"https:\/\/www.constructionnews.co.uk\/\",\"name\":\"Construction News\",\"description\":\"Read UK Construction Industry News, Analysis, Opinion and data\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-GB\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/civils\/authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station-06-05-2025\/#primaryimage\",\"inLanguage\":\"en-GB\",\"url\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2015\/12\/Transpennine-West-Electrification-image.jpg\",\"contentUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2015\/12\/Transpennine-West-Electrification-image.jpg\",\"width\":1024,\"height\":683,\"caption\":\"Transpennine West Electrification image\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/civils\/authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station-06-05-2025\/#webpage\",\"url\":\"https:\/\/www.constructionnews.co.uk\/civils\/authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station-06-05-2025\/\",\"name\":\"Authority mulls reappointing contractor to stalled Leeds rail station | Construction News\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/civils\/authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station-06-05-2025\/#primaryimage\"},\"datePublished\":\"2025-05-06T09:20:49+00:00\",\"dateModified\":\"2025-05-06T09:20:49+00:00\",\"author\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d6199e963b3c9f48fbde9a4b6ee1f14a\"},\"description\":\"The West Yorkshire Combined Authority (WYCA) is due to consider whether to reappoint the same contractor as it looks to restart a stalled railway scheme\",\"breadcrumb\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/civils\/authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station-06-05-2025\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/civils\/authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station-06-05-2025\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/civils\/authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station-06-05-2025\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.constructionnews.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Authority mulls reappointing contractor to stalled Leeds rail station\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d6199e963b3c9f48fbde9a4b6ee1f14a\",\"name\":\"Ian Weinfass\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#personlogo\",\"inLanguage\":\"en-GB\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/046cdd14c1109b6e9a76457bcf5e41c0?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/046cdd14c1109b6e9a76457bcf5e41c0?s=96&d=mm&r=g\",\"caption\":\"Ian Weinfass\"},\"description\":\"Ian is a regular contributor of news and features to Construction News and former deputy editor on the title. A British Journalism Awards finalist 2016 and 2023, Ian won the Feature Writer of the Year category at the International Building Press awards in 2023.\",\"url\":\"https:\/\/www.constructionnews.co.uk\/author\/ian-weinfass\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"description":"The West Yorkshire Combined Authority (WYCA) is due to consider whether to reappoint the same contractor as it looks to restart a stalled railway scheme","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionnews.co.uk\/civils\/authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station-06-05-2025\/","og_locale":"en_GB","og_type":"article","og_title":"Authority mulls reappointing contractor to stalled Leeds rail station | Construction News","og_description":"The West Yorkshire Combined Authority (WYCA) is due to consider whether to reappoint the same contractor as it looks to restart a stalled railway scheme","og_url":"https:\/\/www.constructionnews.co.uk\/civils\/authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station-06-05-2025\/","og_site_name":"Construction News","article_publisher":"https:\/\/www.facebook.com\/CN.community","article_published_time":"2025-05-06T09:20:49+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2015\/12\/Transpennine-West-Electrification-image-1024x683.jpg","type":"image\/jpeg"}],"twitter_card":"summary","twitter_creator":"@CNplus","twitter_site":"@CNplus","twitter_misc":{"Written by":"Ian Weinfass","Estimated reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/www.constructionnews.co.uk\/#website","url":"https:\/\/www.constructionnews.co.uk\/","name":"Construction News","description":"Read UK Construction Industry News, Analysis, Opinion and data","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-GB"},{"@type":"ImageObject","@id":"https:\/\/www.constructionnews.co.uk\/civils\/authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station-06-05-2025\/#primaryimage","inLanguage":"en-GB","url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2015\/12\/Transpennine-West-Electrification-image.jpg","contentUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2015\/12\/Transpennine-West-Electrification-image.jpg","width":1024,"height":683,"caption":"Transpennine West Electrification image"},{"@type":"WebPage","@id":"https:\/\/www.constructionnews.co.uk\/civils\/authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station-06-05-2025\/#webpage","url":"https:\/\/www.constructionnews.co.uk\/civils\/authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station-06-05-2025\/","name":"Authority mulls reappointing contractor to stalled Leeds rail station | Construction News","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/civils\/authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station-06-05-2025\/#primaryimage"},"datePublished":"2025-05-06T09:20:49+00:00","dateModified":"2025-05-06T09:20:49+00:00","author":{"@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d6199e963b3c9f48fbde9a4b6ee1f14a"},"description":"The West Yorkshire Combined Authority (WYCA) is due to consider whether to reappoint the same contractor as it looks to restart a stalled railway scheme","breadcrumb":{"@id":"https:\/\/www.constructionnews.co.uk\/civils\/authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station-06-05-2025\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionnews.co.uk\/civils\/authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station-06-05-2025\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionnews.co.uk\/civils\/authority-mulls-reappointing-contractor-to-stalled-leeds-rail-station-06-05-2025\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionnews.co.uk\/"},{"@type":"ListItem","position":2,"name":"Authority mulls reappointing contractor to stalled Leeds rail station"}]},{"@type":"Person","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/d6199e963b3c9f48fbde9a4b6ee1f14a","name":"Ian Weinfass","image":{"@type":"ImageObject","@id":"https:\/\/www.constructionnews.co.uk\/#personlogo","inLanguage":"en-GB","url":"https:\/\/secure.gravatar.com\/avatar\/046cdd14c1109b6e9a76457bcf5e41c0?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/046cdd14c1109b6e9a76457bcf5e41c0?s=96&d=mm&r=g","caption":"Ian Weinfass"},"description":"Ian is a regular contributor of news and features to Construction News and former deputy editor on the title. A British Journalism Awards finalist 2016 and 2023, Ian won the Feature Writer of the Year category at the International Building Press awards in 2023.","url":"https:\/\/www.constructionnews.co.uk\/author\/ian-weinfass\/"}]}},"_links":{"self":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/519845"}],"collection":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/users\/43915"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/comments?post=519845"}],"version-history":[{"count":7,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/519845\/revisions"}],"predecessor-version":[{"id":519868,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/519845\/revisions\/519868"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media\/349931"}],"wp:attachment":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media?parent=519845"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/categories?post=519845"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/tags?post=519845"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}