{"id":519892,"date":"2025-05-08T12:45:17","date_gmt":"2025-05-08T11:45:17","guid":{"rendered":"https:\/\/www.constructionnews.co.uk\/?p=519892"},"modified":"2025-05-09T08:05:11","modified_gmt":"2025-05-09T07:05:11","slug":"sisks-race-against-time-to-build-man-citys-new-north-stand-roof","status":"publish","type":"post","link":"https:\/\/www.constructionnews.co.uk\/cn-intelligence\/sector\/hotel-leisure\/sisks-race-against-time-to-build-man-citys-new-north-stand-roof-08-05-2025\/","title":{"rendered":"Sisk&#8217;s race against time to build Man City&#8217;s new North Stand roof"},"content":{"rendered":"<p><span style=\"font-weight: 400;\">The football season may be drawing to a close for Manchester City Football Club, but inside the Etihad Stadium, a new challenge is on the horizon.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Since 2023, contractor John Sisk has been building<\/span><a href=\"https:\/\/www.constructionnews.co.uk\/buildings\/sisk-confirms-300m-man-city-stand-win-23-05-2024\/\"> <span style=\"font-weight: 400;\">a new North Stand<\/span><\/a><span style=\"font-weight: 400;\">, adding 6,000 seats to increase the total capacity to 61,000 \u2013 making it the fourth-largest club stadium in the UK.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The \u00a3300m redevelopment will include a new 401-room hotel \u2013 the largest outside of London \u2013 with a sky bar, offices, club shop and museum, as well as a covered fan park for 3,000 people.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The project has already thrown up obstacles, with the team having to work around the football fixture list \u2013 and even a Paul McCartney concert.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">But the clock is ticking on another key challenge.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Manchester City will complete its final home game of the season against Bournemouth on 20 May.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Sisk\u2019s team will then have just six weeks to lower the stadium\u2019s current roof onto the pitch for dismantling and transfer it in small sections through the players\u2019 tunnel, before the groundsmen need to relay the turf in time for the new season.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cWe\u2019ve got a fairly tough few weeks ahead,\u201d Sisk project director Ian Kasher told <\/span><i><span style=\"font-weight: 400;\">Construction News<\/span><\/i><span style=\"font-weight: 400;\">.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cThe old roof needs to be out in four weeks before the new one can be fully fitted, and then the cladding and floodlights will need to be added.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cThe groundsmen need four weeks to relay the grass, so we only have six weeks on the pitch and then the groundsmen take over; there is a one-week buffer in case we have bad weather.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The crew has been building the North Stand\u2019s new roof over the top of the existing one, which comprises six sections of steel-braced bays, each weighing 45 tonnes. It also has to be watertight six weeks before the old one is removed.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Once the football season ends, aluminium decking will be placed onto the pitch to hold a crane. The pitch area needs to be protected to safeguard against vehicles damaging the underground heating and drainage.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Large sections of roof will then be rotated down onto the pitch to be dismantled.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">It might be a challenge dealing with Manchester\u2019s often inclement weather (on average, the city experiences 140 days of rain a year), but it is not the first challenge the project has thrown up.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Kasher, who has previously held posts at real estate developer Everty and structural steel specialist William Hare Group, where he oversaw projects including the development of Battersea Power Station and London Wall Place, had to tackle the daunting task of removing two of the Etihad\u2019s 12 masts without literally bringing the entire roof down.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cIt has been complicated engineering,\u201d he said.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cIt has been challenging, as the whole of the roof around the stadium is held up by masts and cables. To build the North Stand we had to take out two of the big masts.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cWe had to build a sufficient steel structure to transfer the roof onto the new structure, and then we had to demolish the masts from underneath.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The new core structures were constructed around the existing backstay cables and masts. The force then needed to be transferred from the backstay cables and mast onto the new core structure.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The slightest error in detaching the masts could have led to the whole roof collapsing, but the team found a solution 1,500 miles away.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cThe engineering that went into it was amazing,\u201d said Sisk programme director Carl Brierley.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cWe found a Portuguese professor who was a specialist in cable tension.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">&#8220;We flew him over and got him to examine it. He had a headset and hammer and was basically tapping the cables, looking at their frequency to understand what the tension was. It then gave us the alignment for the steel structure, which was 45mm plumb.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The engineers knew that once the cables were detached from the masts, they only had 20mm to work with to ensure the roof was not damaged.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cWe had two tension rods, 4 inches in diameter, next to the plate that these sit on and we had to shorten the rods to pull it back \u2013 and we could only pull it back 20mm so it didn\u2019t damage the roof,\u201d Kasher said.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cWe took stress out of the cables, which took it forward again and then back again over a period of eight hours. It had to stay in the same position because otherwise the roof would start to dismantle. It was a bit of a nervy time but it all went well.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">On matchdays, fans could have been forgiven for thinking that four lucky employees were getting free passes to watch the game from the new stand, as they sat in the empty seats in their hi-vis vests. But w<\/span><span style=\"font-weight: 400;\">ith Manchester renowned for its downpours,\u00a0<\/span><span style=\"font-weight: 400;\">Sisk had to install temporary guttering in case a deluge led to a river of water falling on the crowd below during the roof\u2019s construction. The workers have been standing \u2013 or sitting \u2013 guard to monitor the rain in case action needs to be taken.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Meanwhile, the project has been quite poignant for Brierley, who started his construction career working on Manchester City\u2019s former Maine Road stadium.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Reflecting on the latest build, he adds it has all gone to plan so far: \u201cThere hasn\u2019t been anything unexpected. It has been carefully engineered and I don\u2019t think anything has fazed us,\u201d he said.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cIt has never been done before like this and I think the hardest part was the load transfer.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Manchester City FC may have failed to defend their Premier League title this year, but Brierley is confident that the club will have a fresh pitch in time for another push when the new season kicks off on 16 August.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cIt\u2019ll be fine, I\u2019m confident,\u201d he said.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">\u201cBut [a handover date of] 15 August is the worst-case scenario. We\u2019re all set for as soon as the season closes. We\u2019ll be finished in time for the groundsmen to do their job.\u201d<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The entire project, including the hotel and museum, is due to be completed by 2026.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The football season may be drawing to a close for Manchester City Football Club, but inside the Etihad Stadium, a new challenge is on the horizon. Since 2023, contractor John Sisk has been building a new North Stand, adding 6,000 seats to increase the total capacity to 61,000 \u2013 making it the fourth-largest club stadium &#8230;<\/p>\n","protected":false},"author":155153,"featured_media":350812,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"ep_exclude_from_search":false},"categories":[547,558,74650,559],"tags":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v18.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<meta name=\"description\" content=\"The football season may be drawing to a close for Manchester City Football Club, but inside the Etihad Stadium, a new challenge is on the horizon. Since\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionnews.co.uk\/cn-intelligence\/sector\/hotel-leisure\/sisks-race-against-time-to-build-man-citys-new-north-stand-roof-08-05-2025\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Sisk&#039;s race against time to build Man City&#039;s new North Stand roof | Construction News\" \/>\n<meta property=\"og:description\" content=\"The football season may be drawing to a close for Manchester City Football Club, but inside the Etihad Stadium, a new challenge is on the horizon. Since\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionnews.co.uk\/cn-intelligence\/sector\/hotel-leisure\/sisks-race-against-time-to-build-man-citys-new-north-stand-roof-08-05-2025\/\" \/>\n<meta property=\"og:site_name\" content=\"Construction News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/CN.community\" \/>\n<meta property=\"article:published_time\" content=\"2025-05-08T11:45:17+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-05-09T07:05:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2016\/01\/Severfield_Etihad_Project-over-2m_Specialists-2016-1024x683.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary\" \/>\n<meta name=\"twitter:creator\" content=\"@CNplus\" \/>\n<meta name=\"twitter:site\" content=\"@CNplus\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Nicola Harley\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\",\"url\":\"https:\/\/www.constructionnews.co.uk\/\",\"name\":\"Construction News\",\"description\":\"Read UK Construction Industry News, Analysis, Opinion and data\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-GB\"},{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/cn-intelligence\/sector\/hotel-leisure\/sisks-race-against-time-to-build-man-citys-new-north-stand-roof-08-05-2025\/#primaryimage\",\"inLanguage\":\"en-GB\",\"url\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2016\/01\/Severfield_Etihad_Project-over-2m_Specialists-2016.jpg\",\"contentUrl\":\"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2016\/01\/Severfield_Etihad_Project-over-2m_Specialists-2016.jpg\",\"width\":1024,\"height\":683,\"caption\":\"Severfield Etihad Project over 2m Specialists 2016\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/cn-intelligence\/sector\/hotel-leisure\/sisks-race-against-time-to-build-man-citys-new-north-stand-roof-08-05-2025\/#webpage\",\"url\":\"https:\/\/www.constructionnews.co.uk\/cn-intelligence\/sector\/hotel-leisure\/sisks-race-against-time-to-build-man-citys-new-north-stand-roof-08-05-2025\/\",\"name\":\"Sisk's race against time to build Man City's new North Stand roof | Construction News\",\"isPartOf\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/cn-intelligence\/sector\/hotel-leisure\/sisks-race-against-time-to-build-man-citys-new-north-stand-roof-08-05-2025\/#primaryimage\"},\"datePublished\":\"2025-05-08T11:45:17+00:00\",\"dateModified\":\"2025-05-09T07:05:11+00:00\",\"author\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/1f98ce63244275eac141e2a5bafecfa4\"},\"description\":\"The football season may be drawing to a close for Manchester City Football Club, but inside the Etihad Stadium, a new challenge is on the horizon. Since\",\"breadcrumb\":{\"@id\":\"https:\/\/www.constructionnews.co.uk\/cn-intelligence\/sector\/hotel-leisure\/sisks-race-against-time-to-build-man-citys-new-north-stand-roof-08-05-2025\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.constructionnews.co.uk\/cn-intelligence\/sector\/hotel-leisure\/sisks-race-against-time-to-build-man-citys-new-north-stand-roof-08-05-2025\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/cn-intelligence\/sector\/hotel-leisure\/sisks-race-against-time-to-build-man-citys-new-north-stand-roof-08-05-2025\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.constructionnews.co.uk\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Sisk&#8217;s race against time to build Man City&#8217;s new North Stand roof\"}]},{\"@type\":\"Person\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/1f98ce63244275eac141e2a5bafecfa4\",\"name\":\"Nicola Harley\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\/\/www.constructionnews.co.uk\/#personlogo\",\"inLanguage\":\"en-GB\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/16db48ac27d4487462c0c9d975b8fc70?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/16db48ac27d4487462c0c9d975b8fc70?s=96&d=mm&r=g\",\"caption\":\"Nicola Harley\"},\"url\":\"https:\/\/www.constructionnews.co.uk\/author\/nicola-harley\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"description":"The football season may be drawing to a close for Manchester City Football Club, but inside the Etihad Stadium, a new challenge is on the horizon. Since","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionnews.co.uk\/cn-intelligence\/sector\/hotel-leisure\/sisks-race-against-time-to-build-man-citys-new-north-stand-roof-08-05-2025\/","og_locale":"en_GB","og_type":"article","og_title":"Sisk's race against time to build Man City's new North Stand roof | Construction News","og_description":"The football season may be drawing to a close for Manchester City Football Club, but inside the Etihad Stadium, a new challenge is on the horizon. Since","og_url":"https:\/\/www.constructionnews.co.uk\/cn-intelligence\/sector\/hotel-leisure\/sisks-race-against-time-to-build-man-citys-new-north-stand-roof-08-05-2025\/","og_site_name":"Construction News","article_publisher":"https:\/\/www.facebook.com\/CN.community","article_published_time":"2025-05-08T11:45:17+00:00","article_modified_time":"2025-05-09T07:05:11+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2016\/01\/Severfield_Etihad_Project-over-2m_Specialists-2016-1024x683.jpg","type":"image\/jpeg"}],"twitter_card":"summary","twitter_creator":"@CNplus","twitter_site":"@CNplus","twitter_misc":{"Written by":"Nicola Harley","Estimated reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebSite","@id":"https:\/\/www.constructionnews.co.uk\/#website","url":"https:\/\/www.constructionnews.co.uk\/","name":"Construction News","description":"Read UK Construction Industry News, Analysis, Opinion and data","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionnews.co.uk\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-GB"},{"@type":"ImageObject","@id":"https:\/\/www.constructionnews.co.uk\/cn-intelligence\/sector\/hotel-leisure\/sisks-race-against-time-to-build-man-citys-new-north-stand-roof-08-05-2025\/#primaryimage","inLanguage":"en-GB","url":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2016\/01\/Severfield_Etihad_Project-over-2m_Specialists-2016.jpg","contentUrl":"https:\/\/cdn.ca.emap.com\/wp-content\/uploads\/sites\/8\/2016\/01\/Severfield_Etihad_Project-over-2m_Specialists-2016.jpg","width":1024,"height":683,"caption":"Severfield Etihad Project over 2m Specialists 2016"},{"@type":"WebPage","@id":"https:\/\/www.constructionnews.co.uk\/cn-intelligence\/sector\/hotel-leisure\/sisks-race-against-time-to-build-man-citys-new-north-stand-roof-08-05-2025\/#webpage","url":"https:\/\/www.constructionnews.co.uk\/cn-intelligence\/sector\/hotel-leisure\/sisks-race-against-time-to-build-man-citys-new-north-stand-roof-08-05-2025\/","name":"Sisk's race against time to build Man City's new North Stand roof | Construction News","isPartOf":{"@id":"https:\/\/www.constructionnews.co.uk\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionnews.co.uk\/cn-intelligence\/sector\/hotel-leisure\/sisks-race-against-time-to-build-man-citys-new-north-stand-roof-08-05-2025\/#primaryimage"},"datePublished":"2025-05-08T11:45:17+00:00","dateModified":"2025-05-09T07:05:11+00:00","author":{"@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/1f98ce63244275eac141e2a5bafecfa4"},"description":"The football season may be drawing to a close for Manchester City Football Club, but inside the Etihad Stadium, a new challenge is on the horizon. Since","breadcrumb":{"@id":"https:\/\/www.constructionnews.co.uk\/cn-intelligence\/sector\/hotel-leisure\/sisks-race-against-time-to-build-man-citys-new-north-stand-roof-08-05-2025\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionnews.co.uk\/cn-intelligence\/sector\/hotel-leisure\/sisks-race-against-time-to-build-man-citys-new-north-stand-roof-08-05-2025\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionnews.co.uk\/cn-intelligence\/sector\/hotel-leisure\/sisks-race-against-time-to-build-man-citys-new-north-stand-roof-08-05-2025\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionnews.co.uk\/"},{"@type":"ListItem","position":2,"name":"Sisk&#8217;s race against time to build Man City&#8217;s new North Stand roof"}]},{"@type":"Person","@id":"https:\/\/www.constructionnews.co.uk\/#\/schema\/person\/1f98ce63244275eac141e2a5bafecfa4","name":"Nicola Harley","image":{"@type":"ImageObject","@id":"https:\/\/www.constructionnews.co.uk\/#personlogo","inLanguage":"en-GB","url":"https:\/\/secure.gravatar.com\/avatar\/16db48ac27d4487462c0c9d975b8fc70?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/16db48ac27d4487462c0c9d975b8fc70?s=96&d=mm&r=g","caption":"Nicola Harley"},"url":"https:\/\/www.constructionnews.co.uk\/author\/nicola-harley\/"}]}},"_links":{"self":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/519892"}],"collection":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/users\/155153"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/comments?post=519892"}],"version-history":[{"count":20,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/519892\/revisions"}],"predecessor-version":[{"id":520047,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/posts\/519892\/revisions\/520047"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media\/350812"}],"wp:attachment":[{"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/media?parent=519892"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/categories?post=519892"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionnews.co.uk\/wp-json\/wp\/v2\/tags?post=519892"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}